Basalt underground mine: Long relocation and set-up time — solution & design basis
The plant loses more days to moving and erection than the contract allows — a 100 t/h design basis, configuration and …
Read the solutionVery abrasive and tough; wear cost per tonne, not peak throughput, usually decides the circuit and the liner alloy.
35 engineering articles that start from the properties of basalt rather than from a catalogue capacity figure.
How is basalt processed? Very abrasive and tough; wear cost per tonne, not peak throughput, usually decides the circuit and the liner alloy. Indicative properties are 150–300 MPa compressive strength, high abrasiveness, low moisture sensitivity and 1.50 t/m³ loose bulk density. A typical train is jaw → cone → VSI → 3-deck screen, producing railway ballast, 0–5, 5–16, 16–31.5 mm. All values are nominal selection figures.
| Parameter | Nominal value / typical target |
|---|---|
| Raw material | Basalt |
| Compressive strength | 150–300 MPa |
| Abrasion | high |
| Moisture sensitivity | low |
| Loose bulk density | 1.50 t/m³ |
| Typical circuit | jaw → cone → VSI → 3-deck screen |
| Saleable fractions | railway ballast, 0–5, 5–16, 16–31.5 mm |
The plant loses more days to moving and erection than the contract allows — a 100 t/h design basis, configuration and …
Read the solution
Noise limits at the site boundary are exceeded — a 240 t/h design basis, configuration and acceptance checks.…
Read the solution
The line stabilises at 70–85% of its quoted throughput — a 130 t/h design basis, configuration and acceptance checks.…
Read the solution
Visible dust at transfer points and stack readings above the permit limit — a 190 t/h design basis, configuration and …
Read the solutionGrouped by plant scenario and engineering problem. Each page states its assumptions with units and separates nominal figures from guaranteed performance.
Direct answers to the questions buyers ask most often.
A typical configuration is jaw → cone → VSI → 3-deck screen. Very abrasive and tough; wear cost per tonne, not peak throughput, usually decides the circuit and the liner alloy. The final equipment list depends on feed gradation, moisture, saleable fractions and local power and space limits.
Indicative compressive strength 150–300 MPa, abrasion high, moisture sensitivity low and loose bulk density around 1.50 t/m³. These are nominal ranges for selection, not test certificates for a specific quarry.
Common saleable fractions are railway ballast, 0–5, 5–16, 16–31.5 mm. The grading standard and sampling method must be written into the acceptance test, because aperture series differ between ASTM, EN and ISO.
No. They are engineering configurations and design studies published for equipment selection. For documented deliveries see the project reference library; ask for a written flow sheet before ordering.
Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.