Basalt concrete aggregate supply: Off-specification grading — solution & design basis

The product sieve curve drifts outside its envelope between shifts — a 170 t/h design basis, configuration and acceptance checks.

Basalt concrete aggregate supply with off-specification grading is normally resolved by checking the circuit against the saleable product specification first: measure and log CSS after every liner change. For a 170 t/h design point on basalt, HAMAC would review jaw → cone → VSI → 3-deck screen, then confirm the settings with a written acceptance test. On site, feed variability hides problems that a test sample never shows.

170 t/hindicative design point
150–300 MPacompressive strength
120–250 t/hscenario capacity band
540 kWorder-of-magnitude installed power
Key takeaways
  1. Basalt is high in abrasiveness and low in moisture sensitivity; Very abrasive and tough; wear cost per tonne, not peak throughput, usually decides the circuit and the liner alloy.
  2. For concrete aggregate supply the priority is product consistency, constrained by strict limits on flakiness and fines content.
  3. Off-specification grading typically appears as: the product sieve curve drifts outside its envelope between shifts.
  4. First corrective action: measure and log CSS after every liner change.
  5. All values are nominal; confirm them in a written proposal with a defined test method.

Design basis for basalt concrete aggregate supply

The design basis starts with the rock, not the machine. Basalt is rated at 150–300 MPa compressive strength with high abrasiveness, low moisture sensitivity and a loose bulk density around 1.50 t/m³. Very abrasive and tough; wear cost per tonne, not peak throughput, usually decides the circuit and the liner alloy. The reference conditions should be attached to every figure quoted.

A concrete aggregate supply must hold a tight grading envelope for ready-mix customers, constrained by strict limits on flakiness and fines content. The commercial priority is product consistency. For this combination HAMAC works from an indicative design point of 170 t/h of saleable product, with a maximum feed top size near 650 mm and target fractions of railway ballast, 0–5, 5–16, 16–31.5 mm.

Basalt — design basis (nominal values)
ParameterIndicative value / method
Raw materialBasalt · 150–300 MPa · abrasion high
Design throughput170 t/h saleable product (120–250 t/h scenario band)
Maximum feed size~650 mm
Target productrailway ballast, 0–5, 5–16, 16–31.5 mm
Loose bulk density1.50 t/m³
Suggested circuitjaw → cone → VSI → 3-deck screen
Basalt concrete aggregate supply — Design basis for basalt concrete aggregate supply — HAMAC vibrating screen
Basalt concrete aggregate supply — Design basis for basalt concrete aggregate supply — HAMAC vibrating screen reference.

Why off-specification grading appears in this circuit

The product sieve curve drifts outside its envelope between shifts. In a basalt concrete aggregate supply this is usually a system symptom rather than a single machine fault. On site, feed variability hides problems that a test sample never shows.

  • CSS has moved as liners wear and was not re-measured
  • screen media is worn, blinded or stretched
  • feed gradation changes as the quarry face advances

A change in one stage changes the circulating load in all the others. Before changing a crusher setting, check these in order: 1) run a full sieve analysis on each product fraction; 2) compare current CSS with the commissioning log; 3) inspect every deck for torn or blinded panels. Ask for the mass balance and the test method behind any quoted number.

Recommended equipment configuration

For basalt at 170 t/h the working train is jaw → cone → VSI → 3-deck screen. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for basalt and for a softer rock. The reference conditions should be attached to every figure quoted.

Indicative stage configuration
ParameterIndicative value / method
FeedingVibrating grizzly feeder, VFD control, ~213 t/h design margin
Primary reductionJaw / impact crusher, nominal CSS ~38 mm at the secondary stage
Secondary / tertiarycone
ScreeningMulti-deck screen sized for 70% circulating load
ConveyingBelts sized for fresh feed + return stream, 1.50 t/m³ bulk density
ControlInterlocked start-up, power-based feed trim, 540 kW order-of-magnitude connected load

The corrective actions for off-specification grading are applied on top of this base circuit: measure and log css after every liner change; set a screen-panel replacement interval based on aperture wear; adjust the closed-circuit return rate before changing the crusher setting.

Basalt concrete aggregate supply — Recommended equipment configuration — HAMAC vibrating screen
Basalt concrete aggregate supply — Recommended equipment configuration — HAMAC vibrating screen reference.

Operating settings and acceptance checks

Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 38 mm, a circulating load around 70% and a screen efficiency target above 90%. A change in one stage changes the circulating load in all the others.

  • Run a full sieve analysis on each product fraction
  • Compare current CSS with the commissioning log
  • Inspect every deck for torn or blinded panels
Acceptance checks to write into the contract
ParameterIndicative value / method
CapacityMeasured over a full shift, saleable tonnes, 170 t/h nominal
GradingFull sieve analysis, agreed standard, railway ballast, 0–5, 5–16, 16–31.5 mm
Crusher settingCSS measured and logged, ~38 mm starting point
PowerMain-drive current at steady feed, 540 kW connected load
WearLiner mass before and after, cost per saleable tonne

Ask for the mass balance and the test method behind any quoted number. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.

Cost, risk and what to confirm in writing

Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for basalt, while product consistency determines how much lost production actually costs. On site, feed variability hides problems that a test sample never shows.

  • Ask every supplier for the same flow sheet and mass balance, including the 70% return stream.
  • State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
  • Model annual output as 170 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
  • Agree the sampling method, sieve standard and acceptance test before the order is placed.

The reference conditions should be attached to every figure quoted. Ask for the mass balance and the test method behind any quoted number. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.

Basalt concrete aggregate supply — Cost, risk and what to confirm in writing — HAMAC vibrating screen
Basalt concrete aggregate supply — Cost, risk and what to confirm in writing — HAMAC vibrating screen reference.
FAQ

Basalt concrete aggregate supply — questions answered

Direct answers to the questions buyers ask most often.

What causes off-specification grading in a basalt concrete aggregate supply?

The product sieve curve drifts outside its envelope between shifts. The usual causes are css has moved as liners wear and was not re-measured; screen media is worn, blinded or stretched; feed gradation changes as the quarry face advances. measure and log CSS after every liner change.

Which crusher train suits basalt at 120–250 t/h?

A typical configuration is jaw → cone → VSI → 3-deck screen. Very abrasive and tough; wear cost per tonne, not peak throughput, usually decides the circuit and the liner alloy. The final list depends on feed gradation, moisture, product fractions and local power and space limits.

What should be confirmed before ordering a 170 t/h plant?

A written flow sheet and mass balance, the product grading standard, CSS and screen media, installed power and starting method, the Incoterm and named port, a spares list, and an acceptance test with a defined sampling method. All published figures are nominal.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about this configuration

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Have the feed data for your own site?

Send material, maximum feed size, target t/h and required fractions — a HAMAC engineer will return a written flow sheet and budget.

WhatsApp Get a quote Call