Project summary
250tph Granite Crusher Plant in Philippines is a HAMAC reference project in Philippines. The line is rated at 250tph. Discover the advanced 250tph granite crusher plant in the Philippines by HAMAC Industrial Technology Group. This state-of-the-art facility offers high efficiency, advanced technology, and reliable performance for granite processing.
Discover the advanced 250tph granite crusher plant in the Philippines by HAMAC Industrial Technology Group. This state-of-the-art facility offers high efficiency, advanced technology, and reliable performance for granite processing.
| Parameter | Value |
|---|---|
| Capacity | 250 tons per hour |
| Output Size Range | 0-5mm, 5-10mm, 10-20mm, 20-40mm |
| Primary Crushing | Equipped with heavy-duty jaw crushers designed to handle large feed sizes and reduce granite to manageable sizes. |
| Secondary Crushing | Utilizes cone crushers to further reduce the size of granite, ensuring uniform particle size distribution. |

Equipment configuration and process
The published configuration for this project is listed above. In HAMAC projects, the equipment list is fixed only after the raw material, feed gradation and saleable product fractions are confirmed — the same nominal capacity can require different crushers for basalt, limestone or river pebble.
A typical line of this size runs: vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Dust suppression, washing and a magnetic separator are added where the feed or product specification requires them.
Compare similar plants in the project library or browse plant designs by capacity.
Delivery, installation and support
HAMAC's stated service scope covers initial consultation, solution design, site visit, production, shipment, installation supervision, commissioning, operator training, spare-parts supply and after-sales handling. For export projects the commercial scope is normally agreed as FOB, CFR or CIF, with local civil work and lifting equipment defined in the contract.
- Factory assembly and test before shipment
- Container / break-bulk loading plan with shipped spare parts and tools
- Installation drawings and commissioning supervision
- Operator training and recommended wear-parts stock list