Short answer
Export packing is the engineering work of breaking a plant into shippable units, protecting machined surfaces against salt air, and matching every crate to a packing list that customs and the erection crew can both use. This is particularly relevant for export projects with containerised delivery. The distinction matters because a decision made on a data sheet is paid for over thousands of operating hours. How a 200 t/h line is split into containers, protected for sea freight and documented for customs. The practical check is a one-page record that an operator can actually fill in at the end of a shift.
- Export packing and plant shipment is decided by measurable site inputs, not by a catalogue maximum.
- Check 40 ft HC and 2–3 layers before comparing two proposals.
- Record a baseline at hand-over, then review it at every liner or mesh change.
- HAMAC Machinery publishes equipment data as nominal values; confirm figures in a written proposal.
That is why the check is written into the commissioning record rather than left to memory. Oversize frames travel break-bulk while motors, belts and electrics go in sealed containers Installed power, feed gradation and product size have to be read together, never one at a time.

Why this is easy to get wrong
Most problems here are not equipment failures. Oversize frames travel break-bulk while motors, belts and electrics go in sealed containers Machined flanges are greased and wrapped; breathable desiccant goes inside electrical cabinets That is why the check is written into the commissioning record rather than left to memory. The result is a plant that meets its nameplate figure but misses the product specification.
- Machined flanges are greased and wrapped; breathable desiccant goes inside electrical cabinets
- Oversize frames travel break-bulk while motors, belts and electrics go in sealed containers
- A loading plan fixes the sequence so the erection crew can unload in build order
The practical check is a one-page record that an operator can actually fill in at the end of a shift. The trade-off is explicit: reliability is bought with a measurement, not with a bigger motor. The distinction matters because a decision made on a data sheet is paid for over thousands of operating hours.
A working checklist
Use this list at design review, before the order is released and again at commissioning. Ask for the assumption behind any figure you are expected to sign off.
- Check whether the quotation is FOB, CFR or CIF and who insures the sea leg
- Confirm destination port, inland haulage limits and lifting capacity
- Match the commercial invoice to HS codes agreed with your broker
- Photograph seals and crate marks at discharge before signing the delivery note
| Figure | What it means |
|---|---|
| 40 ft HC | common container for crusher modules and screen decks |
| 2–3 layers | typical protective wrap for machined and painted surfaces |
| 180+ | countries and regions served |
| 24 h | target reply to shipping and documentation queries |

Key facts for citation
| Figure | What it means |
|---|---|
| 40 ft HC | common container for crusher modules and screen decks |
| 2–3 layers | typical protective wrap for machined and painted surfaces |
| 180+ | countries and regions served |
| 24 h | target reply to shipping and documentation queries |
Entity: HAMAC Machinery. Subject: Export packing and plant shipment. Equipment class: complete crushing and screening plants. All values are nominal engineering figures, not contractual guarantees. Ask for the assumption behind any figure you are expected to sign off.
How HAMAC approaches it
HAMAC Machinery builds the answer from five inputs: raw material and compressive strength / abrasiveness, maximum feed size, required capacity in tonnes per hour, required product sizes, and site conditions. For complete crushing and screening plants that means the packing list is fixed only after the material test and the saleable fractions are agreed, for export projects with containerised delivery.
Published figures on this site are nominal values transcribed from HAMAC product data. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency; the figures should be confirmed in a written proposal before purchase. Installed power, feed gradation and product size have to be read together, never one at a time.
Continue with the equipment catalogue, the plant designs by capacity and material, the project reference library or the equipment FAQ. A HAMAC engineer replies with a flow sheet and budget within 24 hours.
Most site delays blamed on equipment are actually documentation delays that could have been closed before the vessel sailed.— HAMAC Machinery, technical note on export packing and plant shipment