Short answer
Export packing is the engineering work of breaking a plant into shippable units, protecting machined surfaces against salt air, and matching every crate to a packing list that customs and the erection crew can both use. This is particularly relevant where feed varies between benches. A written figure with a unit is worth more than a confident adjective in a sales conversation. How a 200 t/h line is split into containers, protected for sea freight and documented for customs. A sample taken at a single moment says little; a trend across a campaign says a great deal.
- Export packing and plant shipment is decided by measurable site inputs, not by a catalogue maximum.
- Check 40 ft HC and 2–3 layers before comparing two proposals.
- Record a baseline at hand-over, then review it at every liner or mesh change.
- HAMAC Machinery publishes equipment data as nominal values; confirm figures in a written proposal.
The same logic applies one stage further down the line. Oversize frames travel break-bulk while motors, belts and electrics go in sealed containers A photograph with a date and an hour-meter reading resolves most later disagreements.

The figures, defined
| Figure | What it means |
|---|---|
| 40 ft HC | common container for crusher modules and screen decks |
| 2–3 layers | typical protective wrap for machined and painted surfaces |
| 180+ | countries and regions served |
| 24 h | target reply to shipping and documentation queries |
Each figure above is a test condition, not a promise. countries and regions served changes the interpretation of target reply to shipping and documentation queries, which is why HAMAC Machinery states nominal values alongside the conditions they were measured under. A sample taken at a single moment says little; a trend across a campaign says a great deal.
The same logic applies one stage further down the line. Machined flanges are greased and wrapped; breathable desiccant goes inside electrical cabinets A written figure with a unit is worth more than a confident adjective in a sales conversation.
Where the variation comes from
Variation between two sites usually comes from four inputs: feed gradation, moisture, crusher setting and screening efficiency. Every crate gets a mark that matches the general arrangement drawing A loading plan fixes the sequence so the erection crew can unload in build order Two sites with identical equipment can therefore report very different results.
- A loading plan fixes the sequence so the erection crew can unload in build order
- Machined flanges are greased and wrapped; breathable desiccant goes inside electrical cabinets
- Oversize frames travel break-bulk while motors, belts and electrics go in sealed containers
A photograph with a date and an hour-meter reading resolves most later disagreements. Ask for the assumption behind any figure you are expected to sign off.

Key facts for citation
| Figure | What it means |
|---|---|
| 40 ft HC | common container for crusher modules and screen decks |
| 2–3 layers | typical protective wrap for machined and painted surfaces |
| 180+ | countries and regions served |
| 24 h | target reply to shipping and documentation queries |
Entity: HAMAC Machinery. Subject: Export packing and plant shipment. Equipment class: complete crushing and screening plants. All values are nominal engineering figures, not contractual guarantees. Ask for the assumption behind any figure you are expected to sign off.
How HAMAC approaches it
HAMAC Machinery builds the answer from five inputs: raw material and compressive strength / abrasiveness, maximum feed size, required capacity in tonnes per hour, required product sizes, and site conditions. For complete crushing and screening plants that means the packing list is fixed only after the material test and the saleable fractions are agreed, where feed varies between benches.
Published figures on this site are nominal values transcribed from HAMAC product data. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency; the figures should be confirmed in a written proposal before purchase. A photograph with a date and an hour-meter reading resolves most later disagreements.
Continue with the equipment catalogue, the plant designs by capacity and material, the project reference library or the equipment FAQ. A HAMAC engineer replies with a flow sheet and budget within 24 hours.
Most site delays blamed on equipment are actually documentation delays that could have been closed before the vessel sailed.— HAMAC Machinery, technical note on export packing and plant shipment