Crawler (Tracked) Vibrating Screen TS Series Maintenance Schedule

Daily, weekly and monthly Crawler (Tracked) Vibrating Screen TS Series maintenance: lubrication, liner inspection, belt tension, safety and troubleshooting basics to keep availability high.

Overview

A simple, disciplined maintenance routine is the cheapest insurance against unplanned downtime on a Crawler (Tracked) Vibrating Screen TS Series.

Overview — HAMAC vibrating screen reference
Overview — HAMAC vibrating screen reference.

Daily

  • Check lubrication levels and look for leaks.
  • Inspect liners / blow bars for uneven wear.
  • Listen for abnormal vibration or noise.
  • Verify belt tension and guard position.

Weekly

  • Grease bearings per the schedule.
  • Check fasteners and hydraulic pressure.
  • Clean screens and check mesh wear.

Monthly

  • Measure liner wear and plan change-out.
  • Inspect drives, couplings and motor.
  • Review wear-part stock against lead time.

Safety

Lock-out / tag-out before any entry; never clear bridging under a running crusher; follow local standards and HAMAC manuals.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineCrawler (Tracked) Vibrating Screen TS Series
CategoryTracked Crushing Plants
Assumed dutycontinuous quarry production
Evaluation horizonfive-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Published Crawler (Tracked) Vibrating Screen TS Series model data

Crawler (Tracked) Vibrating Screen TS Series — nominal published data
ModelTS1860TS2160
Screen deck1800 × 6000 mm, 3 decks2100 × 6000 mm, 3 decks
Max. feeding size≤200 mm≤200 mm
Capacity65–586 t/h81–720 t/h
Motor power22 kW30 kW
Feeding conveyorB1000 × 11.8 mB1000 × 11.8 m
Generator360 kW500 kW

TS1860 / TS2160 tracked three-deck screens, 65–720 t/h, for standalone screening or closed-circuit mobile plants. Read the table column by column against continuous quarry production: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontinuous quarry production
Primary objectivesimple operator maintenance
Evaluation horizonfive-year view
Site conditiona greenfield site
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for crawler (tracked) vibrating screen ts series may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

Project profile these notes assume — HAMAC vibrating screen reference
Project profile these notes assume — HAMAC vibrating screen reference.

From enquiry to the first saleable tonne

  1. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  2. Book shipping, prepare the packing list and confirm the container loading plan.
  3. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  4. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  5. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  6. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  7. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  8. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  9. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.

Most delays at this stage come from missing feed data rather than from manufacturing capacity.

What to verify before you sign

  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Availability of a full-time plant team for liner changes and the lifting equipment on site.
  • Local service partner, technician travel time and visa requirements for your market.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • Wear-part interchangeability across machines in the same circuit.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Product sampling points and the lab equipment needed for routine grading checks.

Share this list with a full-time plant team as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Using one liner profile for both secondary and tertiary stages.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Letting the continuous quarry production duty be defined verbally instead of in the contract.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.

Review the list with a full-time plant team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Test emergency stops, pull wires and interlock trips in sequence.
  2. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  3. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  4. Sample each product fraction and compare with the specification.
  5. Calibrate the belt scale and any level probes against a known load.
  6. Verify rotation direction on every motor before coupling.
  7. Confirm the direction and tension of every belt under no load.
  8. Dry-run the plant empty for the specified period and record vibration.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Crawler (Tracked) Vibrating Screen TS Series Maintenance & Operation Guide — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

How often should Crawler (Tracked) Vibrating Screen TS Series liners be changed?

When wear reaches the change-out limit for your product size — typically tracked by tonnage and visual inspection.

Can HAMAC train my operators?

Yes, installation supervision includes commissioning and operator training.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

How is crawler (tracked) vibrating screen ts series shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call