Blinding and pegging

Blinding is the blockage of apertures by fine or moist material; pegging is the wedging of near-size particles into the openings.

Blinding and pegging Blinding is the blockage of apertures by fine or moist material; pegging is the wedging of near-size particles into the openings. It is expressed in failure mode; Most severe above ~4–6% surface moisture. Engineers use this parameter to translate a product requirement into a machine setting.

failure modeunit / reporting basis
Screeningdomain
Nominaldata convention
HAMAC Machinerysource

What is Blinding and pegging?

Blinding is the blockage of apertures by fine or moist material; pegging is the wedging of near-size particles into the openings. Engineers use this parameter to translate a product requirement into a machine setting. In practice, the feed is never as uniform as a laboratory sample.

The term is used in flow-sheet design, equipment selection and acceptance testing. Both reduce open area, which lowers efficiency and raises circulating load. Treat the figure as a starting point for a plant design, not as a guarantee.

What is Blinding and pegging? — HAMAC vibrating screen reference
What is Blinding and pegging? — HAMAC vibrating screen reference.

Typical values and how blinding and pegging is measured

The figures below are indicative engineering ranges published for selection purposes. They are nominal values, not contractual guarantees, and must be confirmed in a written proposal for a specific material. Measurements should be taken over a full shift, not from a single spot sample.

Blinding and pegging — typical ranges and reference values
ParameterIndicative value
Blinding causefines + moisture
Pegging causenear-size, angular particles
Typical remediesball trays, rubber/PU media, spray water, stroke change

Reporting basis: failure mode. Rubber and polyurethane media flex to shed pegged particles where wire cloth cannot. When comparing two figures, check that the sampling method, sieve standard and reference conditions are the same.

Why blinding and pegging matters in plant selection

  • Both reduce open area, which lowers efficiency and raises circulating load.
  • Rubber and polyurethane media flex to shed pegged particles where wire cloth cannot.
  • Adding water without a washing circuit usually just moves the problem downstream.

Adding water without a washing circuit usually just moves the problem downstream. In practice, the feed is never as uniform as a laboratory sample. Treat the figure as a starting point for a plant design, not as a guarantee.

Applying blinding and pegging in a HAMAC plant

HAMAC engineers fix this value against raw material, feed gradation, moisture, required product sizes and site conditions. Blinding is the blockage of apertures by fine or moist material; pegging is the wedging of near-size particles into the openings. Engineers use this parameter to translate a product requirement into a machine setting.

A typical line runs vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Grinding circuits add a mill, classifier and dust collection. Both reduce open area, which lowers efficiency and raises circulating load.

All figures published on this site are nominal engineering values. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency. Treat the figure as a starting point for a plant design, not as a guarantee.

Applying blinding and pegging in a HAMAC plant — HAMAC vibrating screen reference
Applying blinding and pegging in a HAMAC plant — HAMAC vibrating screen reference.

How to verify blinding and pegging on site

Start with a written test condition: which material, which sieve standard, which sample size and which operating state produced the number. Measurements should be taken over a full shift, not from a single spot sample. Without that, two figures can both be correct and still disagree.

  • Record the value at commissioning together with feeder rate, crusher setting and screen media. Rubber and polyurethane media flex to shed pegged particles where wire cloth cannot.
  • Repeat the measurement after a liner change, a change of feed face or a shift in moisture, and compare like with like.
  • Convert the result into output or cost per saleable tonne before deciding whether an adjustment is worthwhile.

If a quoted figure and a measured figure disagree, check the reference conditions first. Most disputes come from different test methods rather than from faulty equipment. Treat the figure as a starting point for a plant design, not as a guarantee.

Gallery

Blinding and pegging — equipment reference

Photographs from HAMAC manufacturing, testing and project sites.

FAQ

Blinding and pegging — questions answered

Direct answers to the questions buyers ask most often.

What is blinding and pegging in simple terms?

Blinding is the blockage of apertures by fine or moist material; pegging is the wedging of near-size particles into the openings. It is normally reported in failure mode. Both reduce open area, which lowers efficiency and raises circulating load.

What is a typical blinding and pegging value?

Indicative figures are Most severe above ~4–6% surface moisture. These are nominal engineering ranges for selection; confirm them for your own material and test method in a written proposal.

How does blinding and pegging affect operating cost?

Rubber and polyurethane media flex to shed pegged particles where wire cloth cannot. Adding water without a washing circuit usually just moves the problem downstream. Compare options as cost per saleable tonne rather than as a catalogue figure.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about your plant figures

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call