Technical long-tail guide

How to Choose a Spiral (Screw) Sand Washer

Step-by-step guidance for selecting a Spiral (Screw) Sand Washer: match material hardness, capacity and product size, then confirm chamber, liner grade and screen area.

Overview

Choosing a Spiral (Screw) Sand Washer starts with the rock and the target product, not a catalogue number. The steps below turn your project data into a defensible model choice.

Overview — HAMAC VSI sand making machine reference
Overview — HAMAC VSI sand making machine reference.

1. Start with the material

  • Hard, abrasive rock (granite, basalt, quartz): compression crushing, premium Mn liners.
  • Soft rock (limestone, marble, dolomite): impact crushing for shape at lower cost.
  • High silica (river pebble, quartz): plan VSI + wear budget.

2. Size to saleable t/h

Add 10–20% surge to nameplate capacity; undersizing is a permanent bottleneck, oversizing wastes capital.

3. Match the product grading

Product size and shape (flakiness index) decide chamber and screen deck setup.

Pre-order checklist

  • Feed size and max lump.
  • Required t/h and product fractions.
  • Site power (voltage / frequency) and mobility need.
  • Local standards (CE, GOST, etc.).

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineSpiral (Screw) Sand Washer
CategorySand Making & Washing
Assumed dutycontract crushing on short-term sites
Evaluation horizonthree-year view

Ask for the same table from any competing supplier; without it, an offer for spiral (screw) sand washer cannot be compared on scope.

Published Spiral (Screw) Sand Washer model data

Spiral (Screw) Sand Washer — nominal published data
ModelScrew diameter (mm)Sink length (mm)Feeding size (mm)Capacity (t/h)Power (kW)
XL5155157615≤105–155.5
XL7657657620≤1020–6011
XL9209207585≤1040–11011
2XL9209207585≤1080–2202×11
XL112011209750≤1050–13018.5
2XL112011209750≤10100–2602×18.5

XL / 2XL screw sand washers, 5–260 t/h, remove clay and fines from manufactured sand with low water consumption. Read the table column by column against contract crushing on short-term sites: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a brownfield extension in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontract crushing on short-term sites
Primary objectivelowest energy per tonne
Evaluation horizonthree-year view
Site conditiona brownfield extension
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for spiral (screw) sand washer may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

Project profile these notes assume — HAMAC VSI sand making machine reference
Project profile these notes assume — HAMAC VSI sand making machine reference.

From enquiry to the first saleable tonne

  1. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  2. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  3. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  4. Sequence delivery so foundations cure while the equipment is still in manufacture.
  5. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  6. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  7. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  8. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  9. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.

A HAMAC project manager stays with the order from the first data sheet through hand-over in your market.

What to verify before you sign

  • Wear-part interchangeability across machines in the same circuit.
  • Whether the quoted t/h is achieved at contract crushing on short-term sites or under ideal laboratory feed.
  • Dust and noise control designed to the local emission limits for your market.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.

Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.

Review the list with a rotating shift crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Measure and log the as-new CSS / setting for future wear comparison.
  2. Confirm all guards, emergency stops and pull-wire switches function.
  3. Record the baseline grading curve for each product fraction.
  4. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  5. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  6. Confirm the direction and tension of every belt under no load.
  7. Verify rotation direction on every motor before coupling.
  8. Dry-run the plant empty for the specified period and record vibration.

Keep the signed record; it is the only defensible baseline for later performance disputes.

How to Choose the Right Spiral (Screw) Sand Washer — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Which Spiral (Screw) Sand Washer model fits a 100 t/h granite plant?

Typically a primary jaw plus a cone in the secondary stage; exact model is confirmed from feed size and product spec.

Stationary or mobile?

Mobile when the site moves or grid power is unavailable; stationary for permanent high-tonnage lines.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Do you build plants for contract crushing on short-term sites?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.