What is Commissioning?
Commissioning is the supervised start-up of an installed plant, including no-load and loaded runs, setting adjustments and operator training. On site, this is the number operators check when a plant starts to drift off specification. The same machine can therefore produce different results on two quarries.
The term is used in flow-sheet design, equipment selection and acceptance testing. Most performance disputes originate in settings that were never recorded at handover. Record the setting at commissioning so later changes can be interpreted.

Typical values and how commissioning is measured
The figures below are indicative engineering ranges published for selection purposes. They are nominal values, not contractual guarantees, and must be confirmed in a written proposal for a specific material. In practice, the feed is never as uniform as a laboratory sample.
| Parameter | Indicative value |
|---|---|
| No-load checks | rotation, lubrication, interlocks |
| Loaded runs | gradual feed ramp-up |
| Handover | settings log + training record |
Reporting basis: project phase. A commissioning log should list CSS, screen media, feeder rate and measured grading. When comparing two figures, check that the sampling method, sieve standard and reference conditions are the same.
Why commissioning matters in plant selection
- Most performance disputes originate in settings that were never recorded at handover.
- A commissioning log should list CSS, screen media, feeder rate and measured grading.
- Training local operators reduces the long-term cost of ownership more than any optional feature.
Training local operators reduces the long-term cost of ownership more than any optional feature. The same machine can therefore produce different results on two quarries. Record the setting at commissioning so later changes can be interpreted.
Applying commissioning in a HAMAC plant
HAMAC engineers fix this value against raw material, feed gradation, moisture, required product sizes and site conditions. Commissioning is the supervised start-up of an installed plant, including no-load and loaded runs, setting adjustments and operator training. On site, this is the number operators check when a plant starts to drift off specification.
A typical line runs vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Grinding circuits add a mill, classifier and dust collection. Most performance disputes originate in settings that were never recorded at handover.
All figures published on this site are nominal engineering values. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency. Record the setting at commissioning so later changes can be interpreted.

How to verify commissioning on site
Start with a written test condition: which material, which sieve standard, which sample size and which operating state produced the number. In practice, the feed is never as uniform as a laboratory sample. Without that, two figures can both be correct and still disagree.
- Record the value at commissioning together with feeder rate, crusher setting and screen media. A commissioning log should list CSS, screen media, feeder rate and measured grading.
- Repeat the measurement after a liner change, a change of feed face or a shift in moisture, and compare like with like.
- Convert the result into output or cost per saleable tonne before deciding whether an adjustment is worthwhile.
If a quoted figure and a measured figure disagree, check the reference conditions first. Most disputes come from different test methods rather than from faulty equipment. Record the setting at commissioning so later changes can be interpreted.