Technical long-tail guide

Closed side setting (CSS)

What closed side setting (css) means in a crushing plant, typical values, why it matters for equipment selection and how HAMAC engineers apply it.

Overview

The minimum gap between the mantle and concave (or jaw plates) at the discharge end of the crushing chamber, measured at the tightest point of the cycle.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Why it matters in practice

  • Sets the top size of the product
  • Smaller CSS raises fines, power draw and liner wear
  • Measured with a lead plug or an electronic setting system
  • Recheck after every liner change

Applying it to plant selection

Engineers use closed side setting (css) together with feed gradation, moisture content and target tonnage when fixing the flow sheet. HAMAC records the value in the project data sheet so the equipment list, liner grade and motor rating can be checked against the written performance guarantee.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Assumed dutymine pre-beneficiation feed
Evaluation horizonsingle-project view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymine pre-beneficiation feed
Primary objectivelowest cost per tonne
Evaluation horizonsingle-project view
Site conditionan existing quarry bench
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  2. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  3. Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
  4. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  5. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  6. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  7. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  8. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  9. Book shipping, prepare the packing list and confirm the container loading plan.

For a small contractor crew, the commissioning and training steps need more calendar time than the mechanical erection itself.

What to verify before you sign

  • Whether the quoted t/h is achieved at mine pre-beneficiation feed or under ideal laboratory feed.
  • Availability of a small contractor crew for liner changes and the lifting equipment on site.
  • Guaranteed power draw and the lowest cost per tonne trade-off it implies.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
  • Local service partner, technician travel time and visa requirements for your market.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Dust and noise control designed to the local emission limits for your market.

Ask each supplier to price the same list. Quotations for the crushing and screening plant only become comparable when the scope is identical.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

On mine pre-beneficiation feed, the lowest cost per tonne objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Using one liner profile for both secondary and tertiary stages.
  • Buying lowest cost per tonne on price alone and losing it in availability.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at an existing quarry bench.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Overlooking dust, noise and water permits in your market until erection has already started.

On an existing quarry bench, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Measure and log the as-new CSS / setting for future wear comparison.
  2. Check lubrication levels, grease lines and oil cooler operation.
  3. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  4. Record the baseline grading curve for each product fraction.
  5. Dry-run the plant empty for the specified period and record vibration.
  6. Check belt tracking, chute build-up and transfer-point dust.
  7. Confirm the direction and tension of every belt under no load.
  8. Introduce feed in graded steps: 25%, 50%, 75%, then full load.

The commissioning record becomes the reference for every liner change in the single-project plan.

Closed side setting (CSS): Definition & Practical Notes for Crusher Plants — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Who defines closed side setting (css) for my project?

It is agreed in the HAMAC technical proposal after the material sample and site data are reviewed.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.