Technical long-tail guide

FOB, CFR and CIF

What fob, cfr and cif means in a crushing plant, typical values, why it matters for equipment selection and how HAMAC engineers apply it.

Overview

International commercial terms defining where cost, risk and insurance transfer from seller to buyer.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Why it matters in practice

  • FOB: buyer arranges freight
  • CFR: seller pays freight, buyer insures
  • CIF: seller also provides insurance
  • State the port explicitly, e.g. destination port

Applying it to plant selection

Engineers use fob, cfr and cif together with feed gradation, moisture content and target tonnage when fixing the flow sheet. HAMAC records the value in the project data sheet so the equipment list, liner grade and motor rating can be checked against the written performance guarantee.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Assumed dutycontinuous quarry production
Evaluation horizonfive-year view

Use the table as a checklist when comparing quotations for the crushing and screening plant — a lower price often means one of these parameters was quietly reduced.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontinuous quarry production
Primary objectivelowest cost per tonne
Evaluation horizonfive-year view
Site conditiona remote mine site
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  2. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  3. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  4. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  5. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  6. Sequence delivery so foundations cure while the equipment is still in manufacture.
  7. Book shipping, prepare the packing list and confirm the container loading plan.
  8. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  9. Check bearing and lubrication arrangements against the ambient temperature range at the site.

Each step has an owner and a document: flow sheet, general arrangement, foundation reference, packing list and acceptance protocol.

What to verify before you sign

  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Dust and noise control designed to the local emission limits for your market.
  • Guaranteed power draw and the lowest cost per tonne trade-off it implies.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.

The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Freight to your market is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Using one liner profile for both secondary and tertiary stages.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Letting the continuous quarry production duty be defined verbally instead of in the contract.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Hand over the spare-parts list, manuals and maintenance schedule.
  2. Confirm the direction and tension of every belt under no load.
  3. Record power draw, tonnage and chamber pressure at steady state.
  4. Measure and log the as-new CSS / setting for future wear comparison.
  5. Measure noise and dust at the operator position against the local limit.
  6. Record the baseline grading curve for each product fraction.
  7. Test emergency stops, pull wires and interlock trips in sequence.
  8. Verify rotation direction on every motor before coupling.

On a remote mine site, allow extra time for the dust and noise measurements.

FOB, CFR and CIF: Definition & Practical Notes for Crusher Plants — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Who defines fob, cfr and cif for my project?

It is agreed in the HAMAC technical proposal after the material sample and site data are reviewed.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Do you build plants for continuous quarry production?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call