OPEX and CAPEX

CAPEX is the upfront cost of buying and installing a plant; OPEX is the continuing cost of running it.

OPEX and CAPEX CAPEX is the upfront cost of buying and installing a plant; OPEX is the continuing cost of running it. It is expressed in cost categories; Compared over the plant life as cost per tonne. In a crushing or grinding plant this figure is used during equipment selection, not after installation.

cost categoriesunit / reporting basis
Commercialdomain
Nominaldata convention
HAMAC Machinerysource

What is OPEX and CAPEX?

CAPEX is the upfront cost of buying and installing a plant; OPEX is the continuing cost of running it. In a crushing or grinding plant this figure is used during equipment selection, not after installation. Measurements should be taken over a full shift, not from a single spot sample.

The term is used in flow-sheet design, equipment selection and acceptance testing. The cheapest machine often has the highest cost per tonne once wear and downtime are counted. Ask your supplier which test method produced the number you are comparing.

What is OPEX and CAPEX? — HAMAC mobile crushing plant reference
What is OPEX and CAPEX? — HAMAC mobile crushing plant reference.

Typical values and how opex and capex is measured

The figures below are indicative engineering ranges published for selection purposes. They are nominal values, not contractual guarantees, and must be confirmed in a written proposal for a specific material. The same machine can therefore produce different results on two quarries.

OPEX and CAPEX — typical ranges and reference values
ParameterIndicative value
CAPEXequipment, civil works, erection, freight
OPEXenergy, wear, labour, maintenance
Best comparisontotal cost per saleable tonne

Reporting basis: cost categories. Energy and wear parts usually dominate OPEX in crushing; energy dominates in grinding. When comparing two figures, check that the sampling method, sieve standard and reference conditions are the same.

Why opex and capex matters in plant selection

  • The cheapest machine often has the highest cost per tonne once wear and downtime are counted.
  • Energy and wear parts usually dominate OPEX in crushing; energy dominates in grinding.
  • Availability multiplies both sides of the equation.

Availability multiplies both sides of the equation. Measurements should be taken over a full shift, not from a single spot sample. Ask your supplier which test method produced the number you are comparing.

Applying opex and capex in a HAMAC plant

HAMAC engineers fix this value against raw material, feed gradation, moisture, required product sizes and site conditions. CAPEX is the upfront cost of buying and installing a plant; OPEX is the continuing cost of running it. In a crushing or grinding plant this figure is used during equipment selection, not after installation.

A typical line runs vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Grinding circuits add a mill, classifier and dust collection. The cheapest machine often has the highest cost per tonne once wear and downtime are counted.

All figures published on this site are nominal engineering values. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency. Ask your supplier which test method produced the number you are comparing.

Applying opex and capex in a HAMAC plant — HAMAC mobile crushing plant reference
Applying opex and capex in a HAMAC plant — HAMAC mobile crushing plant reference.

How to verify opex and capex on site

Start with a written test condition: which material, which sieve standard, which sample size and which operating state produced the number. The same machine can therefore produce different results on two quarries. Without that, two figures can both be correct and still disagree.

  • Record the value at commissioning together with feeder rate, crusher setting and screen media. Energy and wear parts usually dominate OPEX in crushing; energy dominates in grinding.
  • Repeat the measurement after a liner change, a change of feed face or a shift in moisture, and compare like with like.
  • Convert the result into output or cost per saleable tonne before deciding whether an adjustment is worthwhile.

If a quoted figure and a measured figure disagree, check the reference conditions first. Most disputes come from different test methods rather than from faulty equipment. Ask your supplier which test method produced the number you are comparing.

Gallery

OPEX and CAPEX — equipment reference

Photographs from HAMAC manufacturing, testing and project sites.

FAQ

OPEX and CAPEX — questions answered

Direct answers to the questions buyers ask most often.

What is opex and capex in simple terms?

CAPEX is the upfront cost of buying and installing a plant; OPEX is the continuing cost of running it. It is normally reported in cost categories. The cheapest machine often has the highest cost per tonne once wear and downtime are counted.

What is a typical opex and capex value?

Indicative figures are Compared over the plant life as cost per tonne. These are nominal engineering ranges for selection; confirm them for your own material and test method in a written proposal.

How does opex and capex affect operating cost?

Energy and wear parts usually dominate OPEX in crushing; energy dominates in grinding. Availability multiplies both sides of the equation. Compare options as cost per saleable tonne rather than as a catalogue figure.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about your plant figures

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call