Technical long-tail guide

Construction waste Screening & Classification

Construction waste Screening & Classification. HAMAC configuration, equipment and cost guidance for processing Construction waste.

Overview

Construction waste (Mohs 3, ~60 MPa, low abrasion): processing steps, equipment and cost notes for plant buyers.

Overview — HAMAC crushing and grinding equipment reference
Overview — HAMAC crushing and grinding equipment reference.

Processing steps

  • Primary crushing — mobile jaw.
  • Secondary / tertiary — mobile jaw + impact + screen.
  • Screening for graded products.
  • Dewatering / handling.

Recommended equipment

  • Mobile Jaw Crusher Plant
  • Mobile Impact Crusher Plant

Cost notes

Operating cost is dominated by wear parts on low-abrasion material; choose liner grade by rock, not price.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialConstruction waste
Mohs hardness3
Compressive strength~60 MPa
AbrasivenessLow
Recommended circuitmobile jaw + impact + screen
Assumed dutycement raw-meal preparation
Evaluation horizonfive-year view

Treat this as a living sheet. Every revision of the flow sheet for your market should update the same fields so the equipment list stays traceable.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycement raw-meal preparation
Primary objectiveminimal civil works
Evaluation horizonfive-year view
Site conditiona brownfield extension
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for construction waste crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  2. Review the crusher chamber profile with the liner supplier against Construction waste (Mohs 3, ~60 MPa, low abrasion).
  3. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  4. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  5. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  6. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  7. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  8. Survey the feed: Construction waste (Mohs 3, ~60 MPa, low abrasion); record top size, bulk density, moisture and clay content before fixing the flow sheet.
  9. Sequence delivery so foundations cure while the equipment is still in manufacture.

A realistic programme reserves time for permits, foundation curing and shipping to your market before any steel is cut.

From enquiry to the first saleable tonne — HAMAC crushing and grinding equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and grinding equipment reference.

What to verify before you sign

  • Written performance guarantee, sampling method and acceptance-test protocol.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Availability of a small contractor crew for liner changes and the lifting equipment on site.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Energy draw in kW and the expected kWh per tonne at the design duty.

Share this list with a small contractor crew as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages55%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Freight to your market is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Buying minimal civil works on price alone and losing it in availability.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Using one liner profile for both secondary and tertiary stages.

On a brownfield extension, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Check lubrication levels, grease lines and oil cooler operation.
  2. Record power draw, tonnage and chamber pressure at steady state.
  3. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  4. Verify rotation direction on every motor before coupling.
  5. Record the baseline grading curve for each product fraction.
  6. Measure and log the as-new CSS / setting for future wear comparison.
  7. Hand over the spare-parts list, manuals and maintenance schedule.
  8. Agree the punch list, sign the hand-over protocol and file the as-built drawings.

For a small contractor crew, run through this list twice — once with the supervisor and once without.

Construction waste Screening & Classification — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Best circuit for Construction waste?

mobile jaw + impact + screen. Recycling concrete & asphalt; magnet + air sorter.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call