Technical long-tail guide

100–200 TPH Bauxite Crushing Plant

100–200 TPH Bauxite crushing plant: jaw + impact, capacity 100–200 t/h. HAMAC configuration, equipment list and budget.

Overview

A 100–200 tph plant for bauxite (Mohs 2, ~50 MPa, low abrasion). Recommended circuit: jaw + impact.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Bauxite at this scale

100–200 TPH Bauxite
Capacity100–200 t/h
MaterialBauxite (Low abrasion)
Circuitjaw + impact

Equipment

  • PE Series Jaw Crusher
  • PF Impact Crusher
  • Vibrating Screen

Notes

Washed and screened, then refined to alumina.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialBauxite
Mohs hardness2
Compressive strength~50 MPa
AbrasivenessLow
Recommended circuitjaw + impact
Design capacity100–200 t/h
Typical main linePE/PEW jaw + cone + 3-deck screen
Scale noteMost common export plant size.
Assumed dutycontract crushing on short-term sites
Evaluation horizonten-year view

These values are the starting point for a written proposal on bauxite crushing; they are nominal and should be confirmed against a sample test before manufacture.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontract crushing on short-term sites
Primary objectivelowest energy per tonne
Evaluation horizonten-year view
Site conditiona brownfield extension
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for bauxite crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  2. Book shipping, prepare the packing list and confirm the container loading plan.
  3. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  4. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  5. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  6. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  7. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  8. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  9. Apply jaw + impact; the reduction mechanism must suit low abrasion and a compressive strength near 50 MPa.

Most delays at this stage come from missing feed data rather than from manufacturing capacity.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Wear-part interchangeability across machines in the same circuit.
  • Liner alloy: high-chrome iron is a common starting point for bauxite at low abrasion.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for 100–200 t/h.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Decommissioning or relocation value at the end of a ten-year horizon.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.

Share this list with a rotating shift crew as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance9%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training8%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a low-abrasion feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches 100–200 t/h.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Buying lowest energy per tonne on price alone and losing it in availability.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.

On a brownfield extension, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Hand over the spare-parts list, manuals and maintenance schedule.
  2. Confirm the direction and tension of every belt under no load.
  3. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  4. Test emergency stops, pull wires and interlock trips in sequence.
  5. Check belt tracking, chute build-up and transfer-point dust.
  6. Measure noise and dust at the operator position against the local limit.
  7. Confirm all guards, emergency stops and pull-wire switches function.
  8. Sample each product fraction and compare with the specification.

The commissioning record becomes the reference for every liner change in the ten-year plan.

100–200 TPH Bauxite Crushing Plant — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Best circuit for Bauxite at 100–200 TPH?

jaw + impact. Washed and screened, then refined to alumina.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

How is bauxite crushing shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.