Overview
Practical, numbers-first guidance on the Crawler (Tracked) Vibrating Screen TS Series — written for engineers specifying, buying and running crushing plants.

How it compares
- Primary reduction vs a gyratory for very high tonnage.
- Compression (cone) vs impact for shape vs wear.
- Mobile vs stationary for your site.
When to pick this machine
Crawler (Tracked) Vibrating Screen TS Series is chosen when its reduction mechanism and capacity match your material and product spec.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Machine line | Crawler (Tracked) Vibrating Screen TS Series |
| Category | Tracked Crushing Plants |
| Assumed duty | continuous quarry production |
| Evaluation horizon | five-year view |
Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and five-year operating plan.
Published Crawler (Tracked) Vibrating Screen TS Series model data
| Model | TS1860 | TS2160 |
|---|---|---|
| Screen deck | 1800 × 6000 mm, 3 decks | 2100 × 6000 mm, 3 decks |
| Max. feeding size | ≤200 mm | ≤200 mm |
| Capacity | 65–586 t/h | 81–720 t/h |
| Motor power | 22 kW | 30 kW |
| Feeding conveyor | B1000 × 11.8 m | B1000 × 11.8 m |
| Generator | 360 kW | 500 kW |
TS1860 / TS2160 tracked three-deck screens, 65–720 t/h, for standalone screening or closed-circuit mobile plants. Read the table column by column against continuous quarry production: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | continuous quarry production |
| Primary objective | lowest energy per tonne |
| Evaluation horizon | five-year view |
| Site condition | a greenfield site |
| Operating team | an owner-operator team |
Change any one of these assumptions and the recommended configuration for crawler (tracked) vibrating screen ts series may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Review the crusher chamber profile with the liner supplier against the feed material.
- Plan training for an owner-operator team on CSS adjustment, liner change-out and lock-out / tag-out.
- Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
- Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
- Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
- Choose compression or impact reduction according to hardness, silica content and required particle shape.
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
- Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
A realistic programme reserves time for permits, foundation curing and shipping to your market before any steel is cut.

What to verify before you sign
- Liner alloy: Mn18 with ceramic inserts matched to the rock, not to the lowest purchase price.
- After-sales response time, technician availability and the warranty exclusions in writing.
- Availability of an owner-operator team for liner changes and the lifting equipment on site.
- Energy draw in kW and the expected kWh per tonne at the design duty.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
- Nameplate data for local voltage, frequency and the applicable conformity scheme.
- Guaranteed power draw and the lowest energy per tonne trade-off it implies.
- Closed-side setting range and whether automatic setting regulation is included.
- Control system language, telemetry and remote diagnostics availability.
Share this list with an owner-operator team as well as procurement; operators are the ones who live with the omissions.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 54% | Model size, number of stages and automation level |
| Ocean freight & insurance | 8% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 15% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 8% | kWh per tonne, local tariff and dust suppression water |
A five-year view normally reverses the ranking of two otherwise similar offers once wear and energy are included.
Mistakes that cost more than the machine
- Overlooking dust, noise and water permits in your market until erection has already started.
- Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
- Leaving tramp-iron protection out of the scope to save a small percentage of capital.
- Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
- Skipping the acceptance test, so no one has a baseline to measure degradation against.
- Omitting a bypass chute, so a single screen fault stops the whole line.
- Comparing quotations with different port terms and calling the lower number cheaper.
- Ordering no spares with the plant and waiting six weeks for the first liner set.
Review the list with an owner-operator team before the order is placed — they will recognise most of them.
Commissioning checklist
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Dry-run the plant empty for the specified period and record vibration.
- Sample each product fraction and compare with the specification.
- Measure and log the as-new CSS / setting for future wear comparison.
- Verify rotation direction on every motor before coupling.
- Agree the punch list, sign the hand-over protocol and file the as-built drawings.
- Confirm the direction and tension of every belt under no load.
- Measure noise and dust at the operator position against the local limit.
For an owner-operator team, run through this list twice — once with the supervisor and once without.