What is Availability and utilisation?
Availability is the share of scheduled time a plant is able to run; utilisation is the share of available time it actually produces. On site, this is the number operators check when a plant starts to drift off specification. The same machine can therefore produce different results on two quarries.
The term is used in flow-sheet design, equipment selection and acceptance testing. Annual tonnage is nameplate × hours × utilisation, not nameplate × 8,760. Record the setting at commissioning so later changes can be interpreted.

Typical values and how availability and utilisation is measured
The figures below are indicative engineering ranges published for selection purposes. They are nominal values, not contractual guarantees, and must be confirmed in a written proposal for a specific material. A small change here often shows up first as a change in circulating load.
| Parameter | Indicative value |
|---|---|
| Availability target | > 90% with planned maintenance |
| Utilisation | 75 – 90% typical |
| Main losses | feed interruption, liner changes, weather |
Reporting basis: %. Spare-parts stocking and liner-change planning directly raise availability. When comparing two figures, check that the sampling method, sieve standard and reference conditions are the same.
Why availability and utilisation matters in plant selection
- Annual tonnage is nameplate × hours × utilisation, not nameplate × 8,760.
- Spare-parts stocking and liner-change planning directly raise availability.
- A slightly larger plant with better availability often costs less per tonne.
A slightly larger plant with better availability often costs less per tonne. The same machine can therefore produce different results on two quarries. Record the setting at commissioning so later changes can be interpreted.
Applying availability and utilisation in a HAMAC plant
HAMAC engineers fix this value against raw material, feed gradation, moisture, required product sizes and site conditions. Availability is the share of scheduled time a plant is able to run; utilisation is the share of available time it actually produces. On site, this is the number operators check when a plant starts to drift off specification.
A typical line runs vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Grinding circuits add a mill, classifier and dust collection. Annual tonnage is nameplate × hours × utilisation, not nameplate × 8,760.
All figures published on this site are nominal engineering values. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency. Record the setting at commissioning so later changes can be interpreted.

How to verify availability and utilisation on site
Start with a written test condition: which material, which sieve standard, which sample size and which operating state produced the number. A small change here often shows up first as a change in circulating load. Without that, two figures can both be correct and still disagree.
- Record the value at commissioning together with feeder rate, crusher setting and screen media. Spare-parts stocking and liner-change planning directly raise availability.
- Repeat the measurement after a liner change, a change of feed face or a shift in moisture, and compare like with like.
- Convert the result into output or cost per saleable tonne before deciding whether an adjustment is worthwhile.
If a quoted figure and a measured figure disagree, check the reference conditions first. Most disputes come from different test methods rather than from faulty equipment. Record the setting at commissioning so later changes can be interpreted.