● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Crushing Basalt in Iraq

Basalt crushing plant in Iraq: jaw + cone + VSI, shipped to Umm Qasr at 415V 50Hz. HAMAC flow sheet and CIF quotation.

Overview

Basalt (Mohs 6, ~200 MPa) is processed in Iraq for aggregates, ore or industrial minerals. HAMAC configures the circuit to local conditions: Umm Qasr, 415V 50Hz, IQS.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Basalt properties

Basalt
PropertyValue
Mohs6
Compressive strength200 MPa
AbrasionHigh
Circuitjaw + cone + VSI

In Iraq

  • Port: Umm Qasr.
  • Power: 415V 50Hz.
  • Standards: IQS.

Equipment

  • PE Series Jaw Crusher
  • HPT Multi-Cylinder Hydraulic Cone Crusher
  • VSI Vertical Shaft Impact Crusher (Sand Making Machine)

Budget

Send material, capacity and product sizes for a configured FOB/CIF budget to Umm Qasr.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialBasalt
Mohs hardness6
Compressive strength~200 MPa
AbrasivenessHigh
Recommended circuitjaw + cone + VSI
Destination portUmm Qasr
Site supply415V 50Hz
Local standardsIQS
RegionMiddle East
Assumed dutymine pre-beneficiation feed
Evaluation horizonfive-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymine pre-beneficiation feed
Primary objectivestrict product cubicity
Evaluation horizonfive-year view
Site conditiona greenfield site
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for basalt crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  2. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  3. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  4. Plan training for a mixed local and expatriate team on CSS adjustment, liner change-out and lock-out / tag-out.
  5. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  6. Apply jaw + cone + VSI; the reduction mechanism must suit high abrasion and a compressive strength near 200 MPa.
  7. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  8. Sequence delivery so foundations cure while the equipment is still in manufacture.
  9. Review the crusher chamber profile with the liner supplier against Basalt (Mohs 6, ~200 MPa, high abrasion).

Shortening this sequence is possible on a greenfield site, but only where the feed and product specification are already fully defined.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Dust and noise control designed to the local emission limits for Iraq.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
  • Liner alloy: Mn22 is a common starting point for basalt at high abrasion.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Local service partner, technician travel time and visa requirements for Iraq.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Control system language, telemetry and remote diagnostics availability.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Decommissioning or relocation value at the end of a five-year horizon.

Share this list with a mixed local and expatriate team as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages50%Model size, number of stages and automation level
Ocean freight & insurance10%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts19%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables6%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Using one liner profile for both secondary and tertiary stages.
  • Buying strict product cubicity on price alone and losing it in availability.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Letting the mine pre-beneficiation feed duty be defined verbally instead of in the contract.
  • Overlooking dust, noise and water permits in Iraq until erection has already started.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Check belt tracking, chute build-up and transfer-point dust.
  2. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  3. Confirm the direction and tension of every belt under no load.
  4. Calibrate the belt scale and any level probes against a known load.
  5. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  6. Check lubrication levels, grease lines and oil cooler operation.
  7. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  8. Dry-run the plant empty for the specified period and record vibration.

On a greenfield site, allow extra time for the dust and noise measurements.

Crushing Basalt in Iraq: Plant, Supplier & Cost — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC supply a Basalt plant to Iraq?

Yes — equipment is delivered to Umm Qasr with IQS documentation.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call