Overview
A above 800 tph plant for gold ore (Mohs 4, ~110 MPa, medium abrasion). Recommended circuit: jaw + cone + ball mill.

Gold ore at this scale
| Capacity | 800–1500 t/h |
|---|---|
| Material | Gold ore (Medium abrasion) |
| Circuit | jaw + cone + ball mill |
Equipment
- PE Series Jaw Crusher
- HPT Multi-Cylinder Hydraulic Cone Crusher
Notes
Often free-milling; gravity + CIL/CIP route.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Feed material | Gold ore |
| Mohs hardness | 4 |
| Compressive strength | ~110 MPa |
| Abrasiveness | Medium |
| Recommended circuit | jaw + cone + ball mill |
| Design capacity | 800–1500 t/h |
| Typical main line | gyratory primary + SAG feed |
| Scale note | Mine-scale, often with HPGR. |
| Assumed duty | cement raw-meal preparation |
| Evaluation horizon | five-year view |
These values are the starting point for a written proposal on gold ore crushing; they are nominal and should be confirmed against a sample test before manufacture.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | cement raw-meal preparation |
| Primary objective | maximum mechanical availability |
| Evaluation horizon | five-year view |
| Site condition | a greenfield site |
| Operating team | a mixed local and expatriate team |
Change any one of these assumptions and the recommended configuration for gold ore crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Survey the feed: Gold ore (Mohs 4, ~110 MPa, medium abrasion); record top size, bulk density, moisture and clay content before fixing the flow sheet.
- Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
- Book shipping, prepare the packing list and confirm the container loading plan.
- Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
- Lay out the gyratory primary + SAG feed arrangement with straight conveyor runs and crane access for liner changes.
- Apply jaw + cone + ball mill; the reduction mechanism must suit medium abrasion and a compressive strength near 110 MPa.
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
- Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
- Plan training for a mixed local and expatriate team on CSS adjustment, liner change-out and lock-out / tag-out.
A HAMAC project manager stays with the order from the first data sheet through hand-over in your market.

What to verify before you sign
- Product sampling points and the lab equipment needed for routine grading checks.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
- Whether the quoted t/h is achieved at cement raw-meal preparation or under ideal laboratory feed.
- Local service partner, technician travel time and visa requirements for your market.
- Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
- Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
- Choke-feed arrangement: surge bin, feeder control and level indication.
- Saleable tonnes per hour at each product size, not gross crusher throughput, for 800–1500 t/h.
- Wear-part interchangeability across machines in the same circuit.
Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 56% | Model size, number of stages and automation level |
| Ocean freight & insurance | 8% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 15% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 6% | kWh per tonne, local tariff and dust suppression water |
Freight to your market is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.
Mistakes that cost more than the machine
- Leaving tramp-iron protection out of the scope to save a small percentage of capital.
- Undersizing the screen, then blaming the crusher for a plant that never reaches 800–1500 t/h.
- Using one liner profile for both secondary and tertiary stages.
- Assuming the manufacturer's warranty covers wear parts and consumables.
- Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
- Overlooking dust, noise and water permits in your market until erection has already started.
- Buying on nameplate t/h without converting to saleable product at the specified fractions.
- Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
Review the list with a mixed local and expatriate team before the order is placed — they will recognise most of them.
Commissioning checklist
- Confirm the direction and tension of every belt under no load.
- Dry-run the plant empty for the specified period and record vibration.
- Record the baseline grading curve for each product fraction.
- Hand over the spare-parts list, manuals and maintenance schedule.
- Check belt tracking, chute build-up and transfer-point dust.
- Agree the punch list, sign the hand-over protocol and file the as-built drawings.
- Record power draw, tonnage and chamber pressure at steady state.
- Test emergency stops, pull wires and interlock trips in sequence.
For a mixed local and expatriate team, run through this list twice — once with the supervisor and once without.