100–200 TPH Stone Crusher Plant Cost

100–200 TPH Stone Crusher Plant Cost. HAMAC PE/PEW jaw + cone + 3-deck screen. Free flow sheet and quotation within 24 hours.

Overview

A 100–200 tph crushing plant is one of the most requested export sizes. Main machines: PE/PEW jaw + cone + 3-deck screen. Most common export plant size.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Cost factors

  • Number of crushing stages.
  • Mobility (stationary < wheel < tracked).
  • Wear-parts grade and automation.
  • Screen area, conveyors, dust control.

100–200 TPH budget drivers

100–200 TPH cost
ScopeImpact on price
Mobilitytracked adds hydraulic & engine cost
Stagesmore stages = more machines
AutomationPLC + remote monitoring increases cost
Sparesrecommended stock adds upfront value

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity100–200 t/h
Typical main linePE/PEW jaw + cone + 3-deck screen
Scale noteMost common export plant size.
Assumed dutyseasonal road-project supply
Evaluation horizonseven-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyseasonal road-project supply
Primary objectivesimple operator maintenance
Evaluation horizonseven-year view
Site conditiona greenfield site
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  2. Lay out the PE/PEW jaw + cone + 3-deck screen arrangement with straight conveyor runs and crane access for liner changes.
  3. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  4. Sequence delivery so foundations cure while the equipment is still in manufacture.
  5. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  6. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  7. Review the crusher chamber profile with the liner supplier against the feed material.
  8. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  9. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.

Each step has an owner and a document: flow sheet, general arrangement, foundation reference, packing list and acceptance protocol.

What to verify before you sign

  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • Guaranteed power draw and the simple operator maintenance trade-off it implies.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Whether the quoted t/h is achieved at seasonal road-project supply or under ideal laboratory feed.
  • Dust and noise control designed to the local emission limits for your market.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for 100–200 t/h.

These are the items HAMAC puts in the technical proposal; if another offer is silent on them, ask why.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages52%Model size, number of stages and automation level
Ocean freight & insurance9%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training8%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Buying simple operator maintenance on price alone and losing it in availability.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.

On a greenfield site, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Verify rotation direction on every motor before coupling.
  2. Confirm all guards, emergency stops and pull-wire switches function.
  3. Confirm the direction and tension of every belt under no load.
  4. Measure noise and dust at the operator position against the local limit.
  5. Dry-run the plant empty for the specified period and record vibration.
  6. Check belt tracking, chute build-up and transfer-point dust.
  7. Record power draw, tonnage and chamber pressure at steady state.
  8. Sample each product fraction and compare with the specification.

The commissioning record becomes the reference for every liner change in the seven-year plan.

100–200 TPH Stone Crusher Plant Cost — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

What equipment for a 100–200 TPH plant?

PE/PEW jaw + cone + 3-deck screen

How much does a 100–200 TPH plant cost?

Cost follows the exact specification; request a configured FOB/CIF budget from HAMAC.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.