50–100 TPH Crushing Plant

50–100 TPH Crushing Plant: Equipment & Configuration. HAMAC PE jaw + PF impact / cone + 2-deck screen. Free flow sheet and quotation within 24 hours.

Overview

A 50–100 tph crushing plant is one of the most requested export sizes. Main machines: PE jaw + PF impact / cone + 2-deck screen. Small quarries and concrete plants.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • PE jaw + PF impact / cone + 2-deck screen
  • Feeders and a screen for 2–3 products.
  • Conveyors, control cabinet and (recommended) dust suppression.

How to select

  • Base capacity on SALEABLE t/h at required sizes, +10–20% surge.
  • Hard rock → jaw + cone; soft rock → jaw + impact.
  • Add VSI only when sand / shape is required.

50–100 TPH reference

50–100 TPH reference
Capacity bandTypical main machinesNote
50–100 TPHPE jaw + PF impact / cone + 2-deck screenSmall quarries and concrete plants.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity50–100 t/h
Typical main linePE jaw + PF impact / cone + 2-deck screen
Scale noteSmall quarries and concrete plants.
Assumed dutymanufactured-sand production
Evaluation horizonseven-year view

These values are the starting point for a written proposal on the crushing and screening plant; they are nominal and should be confirmed against a sample test before manufacture.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivelowest cost per tonne
Evaluation horizonseven-year view
Site conditionan existing quarry bench
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Book shipping, prepare the packing list and confirm the container loading plan.
  2. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  3. Review the crusher chamber profile with the liner supplier against the feed material.
  4. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  5. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  6. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  7. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  8. Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.
  9. Confirm the haul-road and stockpile plan with an existing quarry bench in mind before fixing conveyor lengths.

On manufactured-sand production, step ordering matters: survey and sampling must precede the equipment list, or the plant is sized to a guess.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Guaranteed power draw and the lowest cost per tonne trade-off it implies.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Control system language, telemetry and remote diagnostics availability.
  • Availability of a full-time plant team for liner changes and the lifting equipment on site.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Local service partner, technician travel time and visa requirements for your market.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.

Share this list with a full-time plant team as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages52%Model size, number of stages and automation level
Ocean freight & insurance9%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training8%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.

Mistakes that cost more than the machine

  • Letting the manufactured-sand production duty be defined verbally instead of in the contract.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Using one liner profile for both secondary and tertiary stages.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Omitting a bypass chute, so a single screen fault stops the whole line.

Review the list with a full-time plant team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Check belt tracking, chute build-up and transfer-point dust.
  2. Sample each product fraction and compare with the specification.
  3. Record the baseline grading curve for each product fraction.
  4. Verify rotation direction on every motor before coupling.
  5. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  6. Confirm the direction and tension of every belt under no load.
  7. Measure noise and dust at the operator position against the local limit.
  8. Introduce feed in graded steps: 25%, 50%, 75%, then full load.

For a full-time plant team, run through this list twice — once with the supervisor and once without.

50–100 TPH Crushing Plant: Equipment & Configuration — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

What equipment for a 50–100 TPH plant?

PE jaw + PF impact / cone + 2-deck screen

How much does a 50–100 TPH plant cost?

Cost follows the exact specification; request a configured FOB/CIF budget from HAMAC.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Do you build plants for manufactured-sand production?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call