● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Above 800 TPH Crushing Plant

Above 800 TPH Crushing Plant: Equipment & Configuration. HAMAC gyratory primary + SAG feed. Free flow sheet and quotation within 24 hours.

Overview

A above 800 tph crushing plant is one of the most requested export sizes. Main machines: gyratory primary + SAG feed. Mine-scale, often with HPGR.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • gyratory primary + SAG feed
  • Feeders and multiple screens for 3–4 products.
  • Conveyors, control cabinet and (recommended) dust suppression.

How to select

  • Base capacity on SALEABLE t/h at required sizes, +10–20% surge.
  • Hard rock → jaw + cone; soft rock → jaw + impact.
  • Add VSI only when sand / shape is required.

Above 800 TPH reference

Above 800 TPH reference
Capacity bandTypical main machinesNote
Above 800 TPHgyratory primary + SAG feedMine-scale, often with HPGR.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity800–1500 t/h
Typical main linegyratory primary + SAG feed
Scale noteMine-scale, often with HPGR.
Assumed dutyhigh-tonnage aggregate supply
Evaluation horizonthree-year view

Ask for the same table from any competing supplier; without it, an offer for the crushing and screening plant cannot be compared on scope.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyhigh-tonnage aggregate supply
Primary objectivestrict product cubicity
Evaluation horizonthree-year view
Site conditiona coastal export terminal
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  2. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  3. Size the primary stage for 800–1500 t/h with a 10–20% surge allowance — never on nameplate throughput alone.
  4. Review the crusher chamber profile with the liner supplier against the feed material.
  5. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  6. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  7. Lay out the gyratory primary + SAG feed arrangement with straight conveyor runs and crane access for liner changes.
  8. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  9. Check bearing and lubrication arrangements against the ambient temperature range at the site.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Dust and noise control designed to the local emission limits for your market.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for 800–1500 t/h.
  • Liner alloy: Mn18 with ceramic inserts matched to the rock, not to the lowest purchase price.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Decommissioning or relocation value at the end of a three-year horizon.
  • Wear-part interchangeability across machines in the same circuit.
  • Control system language, telemetry and remote diagnostics availability.
  • Closed-side setting range and whether automatic setting regulation is included.

Share this list with a small contractor crew as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages57%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables6%kWh per tonne, local tariff and dust suppression water

On high-tonnage aggregate supply, the strict product cubicity objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Using one liner profile for both secondary and tertiary stages.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Record the baseline grading curve for each product fraction.
  2. Hand over the spare-parts list, manuals and maintenance schedule.
  3. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  4. Confirm the direction and tension of every belt under no load.
  5. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  6. Dry-run the plant empty for the specified period and record vibration.
  7. Verify rotation direction on every motor before coupling.
  8. Check hydraulic pressure, accumulator pre-charge and tramp-release function.

For a small contractor crew, run through this list twice — once with the supervisor and once without.

Above 800 TPH Crushing Plant: Equipment & Configuration — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

What equipment for a Above 800 TPH plant?

gyratory primary + SAG feed

How much does a Above 800 TPH plant cost?

Cost follows the exact specification; request a configured FOB/CIF budget from HAMAC.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Do you build plants for high-tonnage aggregate supply?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call