What is Mass balance?
A mass balance accounts for the tonnage entering, leaving and recirculating at every point in a plant. Buyers meet this term in quotations, test reports and product specifications alike. Measurements should be taken over a full shift, not from a single spot sample.
The term is used in flow-sheet design, equipment selection and acceptance testing. It is the basis for sizing every belt, screen and bin in the line. Record the setting at commissioning so later changes can be interpreted.

Typical values and how mass balance is measured
The figures below are indicative engineering ranges published for selection purposes. They are nominal values, not contractual guarantees, and must be confirmed in a written proposal for a specific material. This is why a written test condition belongs next to every published figure.
| Parameter | Indicative value |
|---|---|
| Fresh feed | the saleable-plant target |
| Circulating load | 20 – 100% of fresh feed |
| Check | input = products + losses |
Reporting basis: t/h per stream. Designing only for fresh feed is the most common cause of an undersized plant. When comparing two figures, check that the sampling method, sieve standard and reference conditions are the same.
Why mass balance matters in plant selection
- It is the basis for sizing every belt, screen and bin in the line.
- Designing only for fresh feed is the most common cause of an undersized plant.
- A mass balance should be delivered with the quotation so the buyer can verify it.
A mass balance should be delivered with the quotation so the buyer can verify it. Measurements should be taken over a full shift, not from a single spot sample. Record the setting at commissioning so later changes can be interpreted.
Applying mass balance in a HAMAC plant
HAMAC engineers fix this value against raw material, feed gradation, moisture, required product sizes and site conditions. A mass balance accounts for the tonnage entering, leaving and recirculating at every point in a plant. Buyers meet this term in quotations, test reports and product specifications alike.
A typical line runs vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Grinding circuits add a mill, classifier and dust collection. It is the basis for sizing every belt, screen and bin in the line.
All figures published on this site are nominal engineering values. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency. Record the setting at commissioning so later changes can be interpreted.

How to verify mass balance on site
Start with a written test condition: which material, which sieve standard, which sample size and which operating state produced the number. This is why a written test condition belongs next to every published figure. Without that, two figures can both be correct and still disagree.
- Record the value at commissioning together with feeder rate, crusher setting and screen media. Designing only for fresh feed is the most common cause of an undersized plant.
- Repeat the measurement after a liner change, a change of feed face or a shift in moisture, and compare like with like.
- Convert the result into output or cost per saleable tonne before deciding whether an adjustment is worthwhile.
If a quoted figure and a measured figure disagree, check the reference conditions first. Most disputes come from different test methods rather than from faulty equipment. Record the setting at commissioning so later changes can be interpreted.