● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Material solutions

Andesite contract crushing: Variable feed gradation — solution & design basis

Crusher power draw swings sharply with each loader cycle — a 110 t/h design basis, configuration and acceptance checks.

Andesite contract crushing with variable feed gradation is normally resolved by checking the circuit against the saleable product specification first: blend feed from two stockpile faces. For a 110 t/h design point on andesite, HAMAC would review jaw → cone → VSI → screen, then confirm the settings with a written acceptance test. Most of these problems are diagnosed at the screen, not at the crusher.

110 t/hindicative design point
120–240 MPacompressive strength
80–200 t/hscenario capacity band
240 kWorder-of-magnitude installed power
Key takeaways
  1. Andesite is medium–high in abrasiveness and low in moisture sensitivity; Good cubicity after a VSI shaping pass; consistent choke feed is needed to hold the flakiness index within the asphalt specification.
  2. For contract crushing the priority is mobility and fast set-up, constrained by short project duration and no permanent foundations.
  3. Variable feed gradation typically appears as: crusher power draw swings sharply with each loader cycle.
  4. First corrective action: blend feed from two stockpile faces.
  5. All values are nominal; confirm them in a written proposal with a defined test method.

Design basis for andesite contract crushing

The design basis starts with the rock, not the machine. Andesite is rated at 120–240 MPa compressive strength with medium–high abrasiveness, low moisture sensitivity and a loose bulk density around 1.44 t/m³. Good cubicity after a VSI shaping pass; consistent choke feed is needed to hold the flakiness index within the asphalt specification. Operator notes from the first month are often the best diagnostic data.

A contract crushing must relocate between sites with minimal erection time, constrained by short project duration and no permanent foundations. The commercial priority is mobility and fast set-up. For this combination HAMAC works from an indicative design point of 110 t/h of saleable product, with a maximum feed top size near 550 mm and target fractions of asphalt aggregate, 0–5, 5–16 mm.

Andesite — design basis (nominal values)
ParameterIndicative value / method
Raw materialAndesite · 120–240 MPa · abrasion medium–high
Design throughput110 t/h saleable product (80–200 t/h scenario band)
Maximum feed size~550 mm
Target productasphalt aggregate, 0–5, 5–16 mm
Loose bulk density1.44 t/m³
Suggested circuitjaw → cone → VSI → screen
Andesite contract crushing — Design basis for andesite contract crushing — HAMAC vibrating feeder
Andesite contract crushing — Design basis for andesite contract crushing — HAMAC vibrating feeder reference.

Why variable feed gradation appears in this circuit

Crusher power draw swings sharply with each loader cycle. In a andesite contract crushing this is usually a system symptom rather than a single machine fault. Most of these problems are diagnosed at the screen, not at the crusher.

  • segregation in the stockpile and the dump hopper
  • no surge buffer between the loader and the primary feeder
  • hard and soft bands are exposed simultaneously at the face

Record the setting before adjusting it, or the baseline is lost. Before changing a crusher setting, check these in order: 1) sample feed gradation at three points across the belt; 2) record power draw at one-minute intervals; 3) check hopper level alarms and feeder response. Ask for the mass balance and the test method behind any quoted number.

Recommended equipment configuration

For andesite at 110 t/h the working train is jaw → cone → VSI → screen. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for andesite and for a softer rock. Operator notes from the first month are often the best diagnostic data.

Indicative stage configuration
ParameterIndicative value / method
FeedingVibrating grizzly feeder, VFD control, ~138 t/h design margin
Primary reductionJaw / impact crusher, nominal CSS ~22 mm at the secondary stage
Secondary / tertiarycone
ScreeningMulti-deck screen sized for 50% circulating load
ConveyingBelts sized for fresh feed + return stream, 1.44 t/m³ bulk density
ControlInterlocked start-up, power-based feed trim, 240 kW order-of-magnitude connected load

The corrective actions for variable feed gradation are applied on top of this base circuit: blend feed from two stockpile faces; add a hopper with level control and a vfd feeder; set the drive power margin for the hardest band, not the average.

Andesite contract crushing — Recommended equipment configuration — HAMAC vibrating feeder
Andesite contract crushing — Recommended equipment configuration — HAMAC vibrating feeder reference.

Operating settings and acceptance checks

Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 22 mm, a circulating load around 50% and a screen efficiency target above 90%. Record the setting before adjusting it, or the baseline is lost.

  • Sample feed gradation at three points across the belt
  • Record power draw at one-minute intervals
  • Check hopper level alarms and feeder response
Acceptance checks to write into the contract
ParameterIndicative value / method
CapacityMeasured over a full shift, saleable tonnes, 110 t/h nominal
GradingFull sieve analysis, agreed standard, asphalt aggregate, 0–5, 5–16 mm
Crusher settingCSS measured and logged, ~22 mm starting point
PowerMain-drive current at steady feed, 240 kW connected load
WearLiner mass before and after, cost per saleable tonne

Ask for the mass balance and the test method behind any quoted number. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.

Cost, risk and what to confirm in writing

Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for andesite, while mobility and fast set-up determines how much lost production actually costs. Most of these problems are diagnosed at the screen, not at the crusher.

  • Ask every supplier for the same flow sheet and mass balance, including the 50% return stream.
  • State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
  • Model annual output as 110 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
  • Agree the sampling method, sieve standard and acceptance test before the order is placed.

Operator notes from the first month are often the best diagnostic data. Ask for the mass balance and the test method behind any quoted number. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.

Andesite contract crushing — Cost, risk and what to confirm in writing — HAMAC vibrating feeder
Andesite contract crushing — Cost, risk and what to confirm in writing — HAMAC vibrating feeder reference.
FAQ

Andesite contract crushing — questions answered

Direct answers to the questions buyers ask most often.

What causes variable feed gradation in a andesite contract crushing?

Crusher power draw swings sharply with each loader cycle. The usual causes are segregation in the stockpile and the dump hopper; no surge buffer between the loader and the primary feeder; hard and soft bands are exposed simultaneously at the face. blend feed from two stockpile faces.

Which crusher train suits andesite at 80–200 t/h?

A typical configuration is jaw → cone → VSI → screen. Good cubicity after a VSI shaping pass; consistent choke feed is needed to hold the flakiness index within the asphalt specification. The final list depends on feed gradation, moisture, product fractions and local power and space limits.

What should be confirmed before ordering a 110 t/h plant?

A written flow sheet and mass balance, the product grading standard, CSS and screen media, installed power and starting method, the Incoterm and named port, a spares list, and an acceptance test with a defined sampling method. All published figures are nominal.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about this configuration

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Have the feed data for your own site?

Send material, maximum feed size, target t/h and required fractions — a HAMAC engineer will return a written flow sheet and budget.