What is Wear cost per tonne?
Wear cost per tonne is the purchase cost of liners, blow bars and screen media divided by the saleable tonnes produced during their life. In a crushing or grinding plant this figure is used during equipment selection, not after installation. This is why a written test condition belongs next to every published figure.
The term is used in flow-sheet design, equipment selection and acceptance testing. It converts an apparently cheap wear part into a comparable operating cost. Confirm the value against your own material in a written proposal before purchase.

Typical values and how wear cost per tonne is measured
The figures below are indicative engineering ranges published for selection purposes. They are nominal values, not contractual guarantees, and must be confirmed in a written proposal for a specific material. Measurements should be taken over a full shift, not from a single spot sample.
| Parameter | Indicative value |
|---|---|
| Numerator | parts + downtime + labour |
| Denominator | saleable tonnes |
| Dominant variable | feed abrasiveness |
Reporting basis: currency / t. Downtime for a change-out often costs more than the part itself. When comparing two figures, check that the sampling method, sieve standard and reference conditions are the same.
Why wear cost per tonne matters in plant selection
- It converts an apparently cheap wear part into a comparable operating cost.
- Downtime for a change-out often costs more than the part itself.
- Test data from a similar rock is far more useful than a catalogue lifetime.
Test data from a similar rock is far more useful than a catalogue lifetime. This is why a written test condition belongs next to every published figure. Confirm the value against your own material in a written proposal before purchase.
Applying wear cost per tonne in a HAMAC plant
HAMAC engineers fix this value against raw material, feed gradation, moisture, required product sizes and site conditions. Wear cost per tonne is the purchase cost of liners, blow bars and screen media divided by the saleable tonnes produced during their life. In a crushing or grinding plant this figure is used during equipment selection, not after installation.
A typical line runs vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Grinding circuits add a mill, classifier and dust collection. It converts an apparently cheap wear part into a comparable operating cost.
All figures published on this site are nominal engineering values. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency. Confirm the value against your own material in a written proposal before purchase.

How to verify wear cost per tonne on site
Start with a written test condition: which material, which sieve standard, which sample size and which operating state produced the number. Measurements should be taken over a full shift, not from a single spot sample. Without that, two figures can both be correct and still disagree.
- Record the value at commissioning together with feeder rate, crusher setting and screen media. Downtime for a change-out often costs more than the part itself.
- Repeat the measurement after a liner change, a change of feed face or a shift in moisture, and compare like with like.
- Convert the result into output or cost per saleable tonne before deciding whether an adjustment is worthwhile.
If a quoted figure and a measured figure disagree, check the reference conditions first. Most disputes come from different test methods rather than from faulty equipment. Confirm the value against your own material in a written proposal before purchase.