Dolomite greenfield plant: Clay contamination — solution & design basis

Screens blind and the chamber packs during wet weather — a 210 t/h design basis, configuration and acceptance checks.

Dolomite greenfield plant with clay contamination is normally resolved by checking the circuit against the saleable product specification first: scalp clay at the grizzly before primary crushing. For a 210 t/h design point on dolomite, HAMAC would review impact crusher → screen → optional Raymond mill, then confirm the settings with a written acceptance test. Most of these problems are diagnosed at the screen, not at the crusher.

210 t/hindicative design point
60–180 MPacompressive strength
200–400 t/hscenario capacity band
620 kWorder-of-magnitude installed power
Key takeaways
  1. Dolomite is low–medium in abrasiveness and low in moisture sensitivity; Suits impact crushing and downstream grinding; the fines fraction is often the most valuable product.
  2. For greenfield plant the priority is a verifiable mass balance, constrained by an untested feed gradation and a fixed commissioning date.
  3. Clay contamination typically appears as: screens blind and the chamber packs during wet weather.
  4. First corrective action: scalp clay at the grizzly before primary crushing.
  5. All values are nominal; confirm them in a written proposal with a defined test method.

Design basis for dolomite greenfield plant

The design basis starts with the rock, not the machine. Dolomite is rated at 60–180 MPa compressive strength with low–medium abrasiveness, low moisture sensitivity and a loose bulk density around 1.42 t/m³. Suits impact crushing and downstream grinding; the fines fraction is often the most valuable product. Operator notes from the first month are often the best diagnostic data.

A greenfield plant must fix the entire flow sheet before civil works begin, constrained by an untested feed gradation and a fixed commissioning date. The commercial priority is a verifiable mass balance. For this combination HAMAC works from an indicative design point of 210 t/h of saleable product, with a maximum feed top size near 450 mm and target fractions of aggregate, agricultural lime, filler powder.

Dolomite — design basis (nominal values)
ParameterIndicative value / method
Raw materialDolomite · 60–180 MPa · abrasion low–medium
Design throughput210 t/h saleable product (200–400 t/h scenario band)
Maximum feed size~450 mm
Target productaggregate, agricultural lime, filler powder
Loose bulk density1.42 t/m³
Suggested circuitimpact crusher → screen → optional Raymond mill
Dolomite greenfield plant — Design basis for dolomite greenfield plant — HAMAC vibrating screen
Dolomite greenfield plant — Design basis for dolomite greenfield plant — HAMAC vibrating screen reference.

Why clay contamination appears in this circuit

Screens blind and the chamber packs during wet weather. In a dolomite greenfield plant this is usually a system symptom rather than a single machine fault. Most of these problems are diagnosed at the screen, not at the crusher.

  • clay-bearing overburden enters with the shot rock
  • spray water is added without a washing circuit
  • transfer chutes are too narrow for sticky material

A change in one stage changes the circulating load in all the others. Before changing a crusher setting, check these in order: 1) measure surface moisture at the shift level; 2) inspect deck open area after each wet shift; 3) log the pressure drop across dust collection. A signed settings log at handover protects both parties later.

Recommended equipment configuration

For dolomite at 210 t/h the working train is impact crusher → screen → optional Raymond mill. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for dolomite and for a softer rock. Operator notes from the first month are often the best diagnostic data.

Indicative stage configuration
ParameterIndicative value / method
FeedingVibrating grizzly feeder, VFD control, ~263 t/h design margin
Primary reductionJaw / impact crusher, nominal CSS ~22 mm at the secondary stage
Secondary / tertiaryscreen
ScreeningMulti-deck screen sized for 30% circulating load
ConveyingBelts sized for fresh feed + return stream, 1.42 t/m³ bulk density
ControlInterlocked start-up, power-based feed trim, 620 kW order-of-magnitude connected load

The corrective actions for clay contamination are applied on top of this base circuit: scalp clay at the grizzly before primary crushing; choose rubber or polyurethane media with ball trays; add a washing stage with water recovery where the specification allows.

Dolomite greenfield plant — Recommended equipment configuration — HAMAC vibrating screen
Dolomite greenfield plant — Recommended equipment configuration — HAMAC vibrating screen reference.

Operating settings and acceptance checks

Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 22 mm, a circulating load around 30% and a screen efficiency target above 90%. A change in one stage changes the circulating load in all the others.

  • Measure surface moisture at the shift level
  • Inspect deck open area after each wet shift
  • Log the pressure drop across dust collection
Acceptance checks to write into the contract
ParameterIndicative value / method
CapacityMeasured over a full shift, saleable tonnes, 210 t/h nominal
GradingFull sieve analysis, agreed standard, aggregate, agricultural lime, filler powder
Crusher settingCSS measured and logged, ~22 mm starting point
PowerMain-drive current at steady feed, 620 kW connected load
WearLiner mass before and after, cost per saleable tonne

A signed settings log at handover protects both parties later. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.

Cost, risk and what to confirm in writing

Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for dolomite, while a verifiable mass balance determines how much lost production actually costs. Most of these problems are diagnosed at the screen, not at the crusher.

  • Ask every supplier for the same flow sheet and mass balance, including the 30% return stream.
  • State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
  • Model annual output as 210 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
  • Agree the sampling method, sieve standard and acceptance test before the order is placed.

Operator notes from the first month are often the best diagnostic data. A signed settings log at handover protects both parties later. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.

Dolomite greenfield plant — Cost, risk and what to confirm in writing — HAMAC vibrating screen
Dolomite greenfield plant — Cost, risk and what to confirm in writing — HAMAC vibrating screen reference.
FAQ

Dolomite greenfield plant — questions answered

Direct answers to the questions buyers ask most often.

What causes clay contamination in a dolomite greenfield plant?

Screens blind and the chamber packs during wet weather. The usual causes are clay-bearing overburden enters with the shot rock; spray water is added without a washing circuit; transfer chutes are too narrow for sticky material. scalp clay at the grizzly before primary crushing.

Which crusher train suits dolomite at 200–400 t/h?

A typical configuration is impact crusher → screen → optional Raymond mill. Suits impact crushing and downstream grinding; the fines fraction is often the most valuable product. The final list depends on feed gradation, moisture, product fractions and local power and space limits.

What should be confirmed before ordering a 210 t/h plant?

A written flow sheet and mass balance, the product grading standard, CSS and screen media, installed power and starting method, the Incoterm and named port, a spares list, and an acceptance test with a defined sampling method. All published figures are nominal.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about this configuration

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Have the feed data for your own site?

Send material, maximum feed size, target t/h and required fractions — a HAMAC engineer will return a written flow sheet and budget.