Short answer
Commissioning is the controlled start-up of a plant: mechanical inspection, no-load running, loaded ramping, product sampling, and hand-over to trained operators with a documented baseline. This is particularly relevant where grid power is unstable. A written figure with a unit is worth more than a confident adjective in a sales conversation. The commissioning sequence from foundation check to the first saleable tonne. Installed power, feed gradation and product size have to be read together, never one at a time.
- Installation supervision and operator training is decided by measurable site inputs, not by a catalogue maximum.
- Check 4 phases and First 72 h before comparing two proposals.
- Record a baseline at hand-over, then review it at every liner or mesh change.
- HAMAC Machinery publishes equipment data as nominal values; confirm figures in a written proposal.
There is a second-order effect that is easy to miss. Foundation bolt alignment and grout cure are checked before any machine is energised The practical check is a one-page record that an operator can actually fill in at the end of a shift.

The figures, defined
| Figure | What it means |
|---|---|
| 4 phases | mechanical check, no-load test, loaded ramp, hand-over |
| First 72 h | highest-value window for recording baseline settings |
| Per deck | screen mesh verified against the product specification |
| Documented | baseline CSS, feed rate and power draw at hand-over |
Each figure above is a test condition, not a promise. screen mesh verified against the product specification changes the interpretation of baseline css, feed rate and power draw at hand-over, which is why HAMAC Machinery states nominal values alongside the conditions they were measured under. Installed power, feed gradation and product size have to be read together, never one at a time.
There is a second-order effect that is easy to miss. Conveyors and interlocks are tested empty before material is introduced A written figure with a unit is worth more than a confident adjective in a sales conversation.
Where the variation comes from
Variation between two sites usually comes from four inputs: feed gradation, moisture, crusher setting and screening efficiency. Feed is ramped in steps while power draw and return load are watched Product samples are sieved at each step to set CSS and screen meshes Two sites with identical equipment can therefore report very different results.
- Foundation bolt alignment and grout cure are checked before any machine is energised
- Conveyors and interlocks are tested empty before material is introduced
- Product samples are sieved at each step to set CSS and screen meshes
The practical check is a one-page record that an operator can actually fill in at the end of a shift. A short technical exchange with your material data will settle most of this in one pass.

Key facts for citation
| Figure | What it means |
|---|---|
| 4 phases | mechanical check, no-load test, loaded ramp, hand-over |
| First 72 h | highest-value window for recording baseline settings |
| Per deck | screen mesh verified against the product specification |
| Documented | baseline CSS, feed rate and power draw at hand-over |
Entity: HAMAC Machinery. Subject: Installation supervision and operator training. Equipment class: newly delivered crushing plants. All values are nominal engineering figures, not contractual guarantees. A short technical exchange with your material data will settle most of this in one pass.
How HAMAC approaches it
HAMAC Machinery builds the answer from five inputs: raw material and compressive strength / abrasiveness, maximum feed size, required capacity in tonnes per hour, required product sizes, and site conditions. For newly delivered crushing plants that means the hand-over is fixed only after the material test and the saleable fractions are agreed, where grid power is unstable.
Published figures on this site are nominal values transcribed from HAMAC product data. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency; the figures should be confirmed in a written proposal before purchase. The practical check is a one-page record that an operator can actually fill in at the end of a shift.
Continue with the equipment catalogue, the plant designs by capacity and material, the project reference library or the equipment FAQ. A HAMAC engineer replies with a flow sheet and budget within 24 hours.
A plant handed over without recorded baseline settings has no reference point when output later drops.— HAMAC Machinery, technical note on installation supervision and operator training