Overview
Buying a Vibrating Screen direct from HAMAC removes the trading margin and gives you engineering support from enquiry to commissioning.

Why buy direct
- One project manager for the whole order.
- Workshop assembly, test and container loading plan.
- Flow-sheet design, layout and foundation reference.
- Installation supervision, training and 24h technical response.
Export & documentation
Quoted FOB / CFR / CIF. Documentation applicable to your market (CE where required), Spanish manuals for LatAm, motors set to local voltage.
How to order
Send project data → receive design + budget in 24h → refine drawings → manufacture → install.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Machine line | Vibrating Screen |
| Category | Supporting Equipments |
| Assumed duty | mine pre-beneficiation feed |
| Evaluation horizon | ten-year view |
HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.
Published Vibrating Screen model data
| Model | Mesh Qty | Mesh Size | Freq | Capacity | Power | Dimension |
|---|---|---|---|---|---|---|
| YK1236 | 1 | 4.32 ㎡ | 800-900 r/min | 25-200 m³/h | 5.5 kW | 4110×1757×970 |
| 2YK1236 | 2 | 4.32 ㎡ | 800-900 r/min | 25-200 m³/h | 7.5 kW | 4142×1748×1340 |
| 3YK1236 | 3 | 4.32 ㎡ | 800-900 r/min | 25-200 m³/h | 11 kW | 4215×1748×1488 |
| 4YK1236 | 4 | 4.32 ㎡ | 800-900 r/min | 25-200 m³/h | 15 kW | 4336×1748×1840 |
| YK1545 | 1 | 6.75 ㎡ | 800-900 r/min | 45-380 m³/h | 11 kW | 4970×2048×823 |
| 2YK1545 | 2 | 6.75 ㎡ | 800-900 r/min | 45-380 m³/h | 15 kW | 5573×2110×1582 |
| 3YK1545 | 3 | 6.75 ㎡ | 800-900 r/min | 45-380 m³/h | 15 kW | 5610×2110×1776 |
| 4YK1545 | 4 | 6.75 ㎡ | 800-900 r/min | 45-380 m³/h | 18.5 kW | 5798×2110×2191 |
The YK Series Circular Vibrating Screen is designed for screening various ores and building materials, suitable for materials with moisture content no more than 5%. Read the table column by column against mine pre-beneficiation feed: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for an existing quarry bench in the written HAMAC proposal.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | mine pre-beneficiation feed |
| Primary objective | fast mobilisation |
| Evaluation horizon | ten-year view |
| Site condition | an existing quarry bench |
| Operating team | a small contractor crew |
Change any one of these assumptions and the recommended configuration for vibrating screen may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
- Choose compression or impact reduction according to hardness, silica content and required particle shape.
- Confirm the haul-road and stockpile plan with an existing quarry bench in mind before fixing conveyor lengths.
- Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
- Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
- Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
- Check bearing and lubrication arrangements against the ambient temperature range at the site.
- Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
On mine pre-beneficiation feed, step ordering matters: survey and sampling must precede the equipment list, or the plant is sized to a guess.

What to verify before you sign
- Local service partner, technician travel time and visa requirements for your market.
- Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
- Ambient temperature, altitude and dust load derating for motors and hydraulics.
- Availability of a small contractor crew for liner changes and the lifting equipment on site.
- Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
- Dust and noise control designed to the local emission limits for your market.
- Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
- Energy draw in kW and the expected kWh per tonne at the design duty.
Ask each supplier to price the same list. Quotations for vibrating screen only become comparable when the scope is identical.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 54% | Model size, number of stages and automation level |
| Ocean freight & insurance | 8% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 15% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 8% | kWh per tonne, local tariff and dust suppression water |
For vibrating screen at your target tonnage, wear parts and energy usually outweigh the difference between two purchase prices within three to five years.
Mistakes that cost more than the machine
- Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
- Specifying motors for the wrong voltage or frequency and rewinding them on site.
- Skipping the acceptance test, so no one has a baseline to measure degradation against.
- Buying fast mobilisation on price alone and losing it in availability.
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
- Using one liner profile for both secondary and tertiary stages.
- Buying on nameplate t/h without converting to saleable product at the specified fractions.
- Ordering no spares with the plant and waiting six weeks for the first liner set.
Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.
Commissioning checklist
- Verify chute liners, skirt rubber and impact bars after the first hour of feed.
- Confirm all guards, emergency stops and pull-wire switches function.
- Measure noise and dust at the operator position against the local limit.
- Agree the punch list, sign the hand-over protocol and file the as-built drawings.
- Dry-run the plant empty for the specified period and record vibration.
- Calibrate the belt scale and any level probes against a known load.
- Hand over the spare-parts list, manuals and maintenance schedule.
- Record the baseline grading curve for each product fraction.
For a small contractor crew, run through this list twice — once with the supervisor and once without.