● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Tracked Jaw Crusher Plant Maintenance Schedule

Daily, weekly and monthly Tracked Jaw Crusher Plant maintenance: lubrication, liner inspection, belt tension, safety and troubleshooting basics to keep availability high.

Overview

A simple, disciplined maintenance routine is the cheapest insurance against unplanned downtime on a Tracked Jaw Crusher Plant.

Overview — HAMAC jaw crusher reference
Overview — HAMAC jaw crusher reference.

Daily

  • Check lubrication levels and look for leaks.
  • Inspect liners / blow bars for uneven wear.
  • Listen for abnormal vibration or noise.
  • Verify belt tension and guard position.

Weekly

  • Grease bearings per the schedule.
  • Check fasteners and hydraulic pressure.
  • Clean screens and check mesh wear.

Monthly

  • Measure liner wear and plan change-out.
  • Inspect drives, couplings and motor.
  • Review wear-part stock against lead time.

Safety

Lock-out / tag-out before any entry; never clear bridging under a running crusher; follow local standards and HAMAC manuals.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineTracked Jaw Crusher Plant
CategoryTracked Crushing Plants
Assumed dutyhigh-tonnage aggregate supply
Evaluation horizonfive-year view

HAMAC engineers fill in the same fields on the project data sheet, which is why two plants of similar tonnage can still require different machines.

Published Tracked Jaw Crusher Plant model data

Tracked Jaw Crusher Plant — nominal published data
ModelMJ150SEMJ260EMJ-350EMJ-450SE
Feeder
Volume(m³)4666
Feeding height(mm)3500435743574357
Maximum feed size(mm)430560630720
Crusher
Host modelMC80MC106MC113MC120
Feed opening(mm)800×5101060X7001130×7501200×870
Closed side setting(mm)40-17570-20070-20070-200

Take productivity to the next level with the HMC Series Tracked Jaw Crusher Plant. Read the table column by column against high-tonnage aggregate supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyhigh-tonnage aggregate supply
Primary objectivetight grading compliance
Evaluation horizonfive-year view
Site conditiona greenfield site
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for tracked jaw crusher plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

Project profile these notes assume — HAMAC jaw crusher reference
Project profile these notes assume — HAMAC jaw crusher reference.

From enquiry to the first saleable tonne

  1. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  2. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  3. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  4. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  5. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  6. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  7. Book shipping, prepare the packing list and confirm the container loading plan.
  8. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  9. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.

Shortening this sequence is possible on a greenfield site, but only where the feed and product specification are already fully defined.

What to verify before you sign

  • Product sampling points and the lab equipment needed for routine grading checks.
  • Liner alloy: Mn18 with ceramic inserts matched to the rock, not to the lowest purchase price.
  • Local service partner, technician travel time and visa requirements for your market.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Decommissioning or relocation value at the end of a five-year horizon.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • Whether the quoted t/h is achieved at high-tonnage aggregate supply or under ideal laboratory feed.
  • After-sales response time, technician availability and the warranty exclusions in writing.

Share this list with a rotating shift crew as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Letting the high-tonnage aggregate supply duty be defined verbally instead of in the contract.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Using one liner profile for both secondary and tertiary stages.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.

For high-tonnage aggregate supply, protect the tight grading compliance requirement explicitly in the contract documents.

Commissioning checklist

  1. Test emergency stops, pull wires and interlock trips in sequence.
  2. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  3. Measure and log the as-new CSS / setting for future wear comparison.
  4. Calibrate the belt scale and any level probes against a known load.
  5. Record the baseline grading curve for each product fraction.
  6. Hand over the spare-parts list, manuals and maintenance schedule.
  7. Check belt tracking, chute build-up and transfer-point dust.
  8. Check lubrication levels, grease lines and oil cooler operation.

For a rotating shift crew, run through this list twice — once with the supervisor and once without.

Tracked Jaw Crusher Plant Maintenance & Operation Guide — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

How often should Tracked Jaw Crusher Plant liners be changed?

When wear reaches the change-out limit for your product size — typically tracked by tonnage and visual inspection.

Can HAMAC train my operators?

Yes, installation supervision includes commissioning and operator training.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

How is tracked jaw crusher plant shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call