● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Mobile VSI Crusher Plant (Tertiary Crushing) Price — What You Actually Pay

HAMAC Mobile VSI Crusher Plant (Tertiary Crushing) price ranges by model size, mobility and motor spec. Get FOB / CIF quotations and a configured plant budget within 24 hours.

Overview

The Mobile VSI Crusher Plant (Tertiary Crushing) is offered across several model sizes. Price depends on capacity, wear-package grade, mobility (stationary, wheel or tracked) and the level of automation, not on a single list price.

Overview — HAMAC VSI sand making machine reference
Overview — HAMAC VSI sand making machine reference.

What drives the price

  • Model size and rated capacity — larger rotors / chambers cost more.
  • Mobility: stationary < wheel-mounted < tracked (tracked adds hydraulic & engine cost).
  • Motor specification and starter (soft-start / VFD) and local voltage.
  • Wear-parts grade (Mn13 / Mn18 / Mn22 / high-chrome) and spare-parts package.
  • Control system: relay panel vs PLC with remote monitoring.

Typical price brackets

Entry models for contractor use start in the low five-figure USD range; mid-size export configurations are typically six-figure; large tracked or fully automated lines are higher. Exact numbers depend on the technical specification — request a written quotation rather than a ballpark.

How to get an accurate quote

Send material, feed size, target t/h and product sizes. HAMAC returns a flow sheet, equipment list and FOB / CFR / CIF price within 24 hours.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineMobile VSI Crusher Plant (Tertiary Crushing)
CategoryWheel Type Mobile Crushers
Assumed dutymanufactured-sand production
Evaluation horizonfive-year view

Ask for the same table from any competing supplier; without it, an offer for mobile vsi crusher plant (tertiary crushing) cannot be compared on scope.

Published Mobile VSI Crusher Plant (Tertiary Crushing) model data

Mobile VSI Crusher Plant (Tertiary Crushing) — nominal published data
ModelVSI unitBelt feederVibrating screenCapacity (t/h)
K3-V7615-1CVS17615B10003YK184850–150
K3-V8522-1CVS18522B10003YK1548100–200
K3-V9532-1CVS19532B12003YK1848150–300
K3-V1145-1CVS11145B1200—200–400

K3 series wheel-mounted VSI plant for third-stage crushing, 50–400 t/h, for complete sand making or high-quality shaped aggregate. Read the table column by column against manufactured-sand production: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a confined urban yard in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivelowest cost per tonne
Evaluation horizonfive-year view
Site conditiona confined urban yard
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for mobile vsi crusher plant (tertiary crushing) may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  2. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  3. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  4. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  5. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  6. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  7. Book shipping, prepare the packing list and confirm the container loading plan.
  8. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  9. Review the crusher chamber profile with the liner supplier against the feed material.

For a rotating shift crew, the commissioning and training steps need more calendar time than the mechanical erection itself.

From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference
From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference.

What to verify before you sign

  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Dust and noise control designed to the local emission limits for your market.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.

For manufactured-sand production, give the lowest cost per tonne line extra weight; a generic checklist will not rank the offers correctly.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a confined urban yard.

On a confined urban yard, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Record power draw, tonnage and chamber pressure at steady state.
  2. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  3. Confirm the direction and tension of every belt under no load.
  4. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  5. Measure and log the as-new CSS / setting for future wear comparison.
  6. Sample each product fraction and compare with the specification.
  7. Test emergency stops, pull wires and interlock trips in sequence.
  8. Verify rotation direction on every motor before coupling.

For a rotating shift crew, run through this list twice — once with the supervisor and once without.

Mobile VSI Crusher Plant (Tertiary Crushing) Price: FOB, CIF & What Drives It — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

What is the Mobile VSI Crusher Plant (Tertiary Crushing) FOB price?

FOB price varies with model and specification; HAMAC quotes FOB, CFR or CIF against your exact requirement.

Why is there no single list price?

Each plant is configured to material and capacity, so the equipment list and price differ per project.

Do you build plants for manufactured-sand production?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call