Overview
Practical, numbers-first guidance on the Wheel Bucket Type Sand Washer — written for engineers specifying, buying and running crushing plants.

How it compares
- Primary reduction vs a gyratory for very high tonnage.
- Compression (cone) vs impact for shape vs wear.
- Mobile vs stationary for your site.
When to pick this machine
Wheel Bucket Type Sand Washer is chosen when its reduction mechanism and capacity match your material and product spec.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Machine line | Wheel Bucket Type Sand Washer |
| Category | Sand Making & Washing |
| Assumed duty | demolition and recycling duties |
| Evaluation horizon | seven-year view |
Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and seven-year operating plan.
Published Wheel Bucket Type Sand Washer model data
| Model | Impeller (mm) | Feeding size (mm) | Capacity (t/h) | Power (kW) | Overall dimension (mm) |
|---|---|---|---|---|---|
| XSD2610 | φ2600 | ≤10 | 30–60 | 7.5 | 3320 × 2125 × 2670 |
| XSD2900 | φ2900 | ≤10 | 50–90 | 15 | 3810 × 2686 × 3085 |
| XSD3016 | φ3000 | ≤10 | 80–120 | 18.5 | 3845 × 3000 × 3080 |
| XSD3220 | φ3000 | ≤10 | 120–200 | 22 | 4150 × 3780 × 3400 |
| XSD3620 | φ3600 | ≤10 | 150–280 | 30 | 4600 × 3780 × 3900 |
XSD wheel bucket sand washers, 30–280 t/h, with low fines loss and compact footprint for washed sand and aggregate. Read the table column by column against demolition and recycling duties: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for an existing quarry bench in the written HAMAC proposal.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | demolition and recycling duties |
| Primary objective | fast mobilisation |
| Evaluation horizon | seven-year view |
| Site condition | an existing quarry bench |
| Operating team | a full-time plant team |
Change any one of these assumptions and the recommended configuration for wheel bucket type sand washer may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Confirm the haul-road and stockpile plan with an existing quarry bench in mind before fixing conveyor lengths.
- Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
- Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.
- Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
- Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
- Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
- Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
- Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
Most delays at this stage come from missing feed data rather than from manufacturing capacity.

What to verify before you sign
- Dust and noise control designed to the local emission limits for your market.
- Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
- Wear-part interchangeability across machines in the same circuit.
- Energy draw in kW and the expected kWh per tonne at the design duty.
- Choke-feed arrangement: surge bin, feeder control and level indication.
- Written performance guarantee, sampling method and acceptance-test protocol.
- After-sales response time, technician availability and the warranty exclusions in writing.
- Whether the quoted t/h is achieved at demolition and recycling duties or under ideal laboratory feed.
- Decommissioning or relocation value at the end of a seven-year horizon.
Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 54% | Model size, number of stages and automation level |
| Ocean freight & insurance | 8% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 15% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 8% | kWh per tonne, local tariff and dust suppression water |
Freight to your market is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.
Mistakes that cost more than the machine
- Skipping a geotechnical check and discovering settlement under the primary crusher at an existing quarry bench.
- Omitting a bypass chute, so a single screen fault stops the whole line.
- Specifying motors for the wrong voltage or frequency and rewinding them on site.
- Overlooking dust, noise and water permits in your market until erection has already started.
- Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
- Assuming the manufacturer's warranty covers wear parts and consumables.
- Leaving tramp-iron protection out of the scope to save a small percentage of capital.
- Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
Review the list with a full-time plant team before the order is placed — they will recognise most of them.
Commissioning checklist
- Measure and log the as-new CSS / setting for future wear comparison.
- Verify rotation direction on every motor before coupling.
- Agree the punch list, sign the hand-over protocol and file the as-built drawings.
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Sample each product fraction and compare with the specification.
- Calibrate the belt scale and any level probes against a known load.
- Measure noise and dust at the operator position against the local limit.
- Confirm the direction and tension of every belt under no load.
Keep the signed record; it is the only defensible baseline for later performance disputes.