Crawler (Tracked) Vibrating Screen TS Series Installation Steps

Crawler (Tracked) Vibrating Screen TS Series Installation Steps. HAMAC practical guidance with checklists and FAQ for plant buyers and operators.

Overview

Practical, numbers-first guidance on the Crawler (Tracked) Vibrating Screen TS Series — written for engineers specifying, buying and running crushing plants.

Overview — HAMAC vibrating screen reference
Overview — HAMAC vibrating screen reference.

Preparation

  • Confirm foundation per HAMAC layout.
  • Check power and cable routing.
  • Lift and level on grout.

Commissioning

  • Dry run, then graded load.
  • Set CSS and verify product.
  • Train operators.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineCrawler (Tracked) Vibrating Screen TS Series
CategoryTracked Crushing Plants
Assumed dutymanufactured-sand production
Evaluation horizonsingle-project view

Ask for the same table from any competing supplier; without it, an offer for crawler (tracked) vibrating screen ts series cannot be compared on scope.

Published Crawler (Tracked) Vibrating Screen TS Series model data

Crawler (Tracked) Vibrating Screen TS Series — nominal published data
ModelTS1860TS2160
Screen deck1800 × 6000 mm, 3 decks2100 × 6000 mm, 3 decks
Max. feeding size≤200 mm≤200 mm
Capacity65–586 t/h81–720 t/h
Motor power22 kW30 kW
Feeding conveyorB1000 × 11.8 mB1000 × 11.8 m
Generator360 kW500 kW

TS1860 / TS2160 tracked three-deck screens, 65–720 t/h, for standalone screening or closed-circuit mobile plants. Read the table column by column against manufactured-sand production: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivefast mobilisation
Evaluation horizonsingle-project view
Site conditiona greenfield site
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for crawler (tracked) vibrating screen ts series may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  2. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  3. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  4. Book shipping, prepare the packing list and confirm the container loading plan.
  5. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  6. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  7. Sequence delivery so foundations cure while the equipment is still in manufacture.
  8. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  9. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.

Each step has an owner and a document: flow sheet, general arrangement, foundation reference, packing list and acceptance protocol.

From enquiry to the first saleable tonne — HAMAC vibrating screen reference
From enquiry to the first saleable tonne — HAMAC vibrating screen reference.

What to verify before you sign

  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Guaranteed power draw and the fast mobilisation trade-off it implies.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Control system language, telemetry and remote diagnostics availability.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Decommissioning or relocation value at the end of a single-project horizon.
  • Closed-side setting range and whether automatic setting regulation is included.

Share this list with a rotating shift crew as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

On manufactured-sand production, the fast mobilisation objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Letting the manufactured-sand production duty be defined verbally instead of in the contract.
  • Using one liner profile for both secondary and tertiary stages.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.

On a greenfield site, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Confirm the direction and tension of every belt under no load.
  2. Measure and log the as-new CSS / setting for future wear comparison.
  3. Verify rotation direction on every motor before coupling.
  4. Confirm all guards, emergency stops and pull-wire switches function.
  5. Test emergency stops, pull wires and interlock trips in sequence.
  6. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  7. Check belt tracking, chute build-up and transfer-point dust.
  8. Hand over the spare-parts list, manuals and maintenance schedule.

The commissioning record becomes the reference for every liner change in the single-project plan.

Crawler (Tracked) Vibrating Screen TS Series Installation Steps — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Where do I get Crawler (Tracked) Vibrating Screen TS Series support?

HAMAC provides installation supervision, training and a 24-hour technical response target.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call