KJ Series Modular Crushing & Screening Plant Installation Steps

KJ Series Modular Crushing & Screening Plant Installation Steps. HAMAC practical guidance with checklists and FAQ for plant buyers and operators.

Overview

Practical, numbers-first guidance on the KJ Series Modular Crushing & Screening Plant — written for engineers specifying, buying and running crushing plants.

Overview — HAMAC vibrating screen reference
Overview — HAMAC vibrating screen reference.

Preparation

  • Confirm foundation per HAMAC layout.
  • Check power and cable routing.
  • Lift and level on grout.

Commissioning

  • Dry run, then graded load.
  • Set CSS and verify product.
  • Train operators.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineKJ Series Modular Crushing & Screening Plant
CategoryModular Crushing Plant
Assumed dutyseasonal road-project supply
Evaluation horizonseven-year view

The figures above are transcribed from published HAMAC data and from the material properties of the feed; site measurements take precedence.

Published KJ Series Modular Crushing & Screening Plant model data

KJ Series Modular Crushing & Screening Plant — nominal published data
Plant typeModelStandard deviceVehicle-mounted deviceCapacity (t/h)Transport dimensions (mm)
Jaw crusher plantKJ98GZDT9538HDX9890–35012750 × 3020 × 3850
Jaw crusher plantKJ110GZDT1145BHDX110120–45013050 × 3050 × 4000
Impact crusher plantKJ1213GZDT9538C1121380–32012970 × 3020 × 3920
Impact crusher plantKJ1316GZDT1145BC11316100–40013290 × 3050 × 4080
Cone crusher plantK1300—HPM300C160–28015650 × 3270 × 3780
Cone crusher plantKJ250—SC250F190–35015600 × 3270 × 3800
Sand maker plantKJ0926—HVI092685–24015400 × 2770 × 3780
Sand maker plantKJ1040—HVI1040120–28415400 × 2920 × 3970

KJ modular stations for jaw, impact, cone, VSI sand making and screening, 60–500 t/h, with foundation-free installation and transportable dimensions. Read the table column by column against seasonal road-project supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyseasonal road-project supply
Primary objectivestrict product cubicity
Evaluation horizonseven-year view
Site conditiona greenfield site
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for kj series modular crushing & screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  2. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  3. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  4. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  5. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  6. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  7. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  8. Sequence delivery so foundations cure while the equipment is still in manufacture.
  9. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.

Each step has an owner and a document: flow sheet, general arrangement, foundation reference, packing list and acceptance protocol.

From enquiry to the first saleable tonne — HAMAC vibrating screen reference
From enquiry to the first saleable tonne — HAMAC vibrating screen reference.

What to verify before you sign

  • Decommissioning or relocation value at the end of a seven-year horizon.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • Control system language, telemetry and remote diagnostics availability.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Liner alloy: Mn22 matched to the rock, not to the lowest purchase price.
  • Wear-part interchangeability across machines in the same circuit.

The relative weight of each item changes with the project: wear parts dominate on abrasive rock, availability dominates on remote sites.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

On seasonal road-project supply, the strict product cubicity objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Buying strict product cubicity on price alone and losing it in availability.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Using one liner profile for both secondary and tertiary stages.

For seasonal road-project supply, protect the strict product cubicity requirement explicitly in the contract documents.

Commissioning checklist

  1. Sample each product fraction and compare with the specification.
  2. Confirm the direction and tension of every belt under no load.
  3. Record power draw, tonnage and chamber pressure at steady state.
  4. Verify rotation direction on every motor before coupling.
  5. Record the baseline grading curve for each product fraction.
  6. Measure noise and dust at the operator position against the local limit.
  7. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  8. Calibrate the belt scale and any level probes against a known load.

Keep the signed record; it is the only defensible baseline for later performance disputes.

KJ Series Modular Crushing & Screening Plant Installation Steps — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Where do I get KJ Series Modular Crushing & Screening Plant support?

HAMAC provides installation supervision, training and a 24-hour technical response target.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.