Gabbro Screening & Classification

Gabbro Screening & Classification. HAMAC configuration, equipment and cost guidance for processing Gabbro. Includes published model data and an acceptance-test checklist.

Overview

Gabbro (Mohs 6, ~180 MPa, high abrasion): processing steps, equipment and cost notes for plant buyers.

Overview — HAMAC crushing and grinding equipment reference
Overview — HAMAC crushing and grinding equipment reference.

Processing steps

  • Primary crushing — jaw.
  • Secondary / tertiary — jaw + cone.
  • Screening for graded products.
  • Dewatering / handling.

Recommended equipment

  • PE Series Jaw Crusher
  • HPT Multi-Cylinder Hydraulic Cone Crusher

Cost notes

Operating cost is dominated by wear parts on high-abrasion material; choose liner grade by rock, not price.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialGabbro
Mohs hardness6
Compressive strength~180 MPa
AbrasivenessHigh
Recommended circuitjaw + cone
Assumed dutycontinuous quarry production
Evaluation horizonseven-year view

The figures above are transcribed from published HAMAC data and from the material properties of gabbro; site measurements take precedence.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontinuous quarry production
Primary objectivefast mobilisation
Evaluation horizonseven-year view
Site conditiona brownfield extension
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for gabbro crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Book shipping, prepare the packing list and confirm the container loading plan.
  2. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  3. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  4. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  5. Apply jaw + cone; the reduction mechanism must suit high abrasion and a compressive strength near 180 MPa.
  6. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  7. Plan training for a mixed local and expatriate team on CSS adjustment, liner change-out and lock-out / tag-out.
  8. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  9. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.

Shortening this sequence is possible on a brownfield extension, but only where the feed and product specification are already fully defined.

From enquiry to the first saleable tonne — HAMAC crushing and grinding equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and grinding equipment reference.

What to verify before you sign

  • Dust and noise control designed to the local emission limits for your market.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Control system language, telemetry and remote diagnostics availability.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Whether the quoted t/h is achieved at continuous quarry production or under ideal laboratory feed.
  • Local service partner, technician travel time and visa requirements for your market.
  • Wear-part interchangeability across machines in the same circuit.

The relative weight of each item changes with the project: wear parts dominate on abrasive rock, availability dominates on remote sites.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages51%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts19%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

On continuous quarry production, the fast mobilisation objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Using one liner profile for both secondary and tertiary stages.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Confirm the direction and tension of every belt under no load.
  2. Record the baseline grading curve for each product fraction.
  3. Check lubrication levels, grease lines and oil cooler operation.
  4. Sample each product fraction and compare with the specification.
  5. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  6. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  7. Measure and log the as-new CSS / setting for future wear comparison.
  8. Test emergency stops, pull wires and interlock trips in sequence.

On a brownfield extension, allow extra time for the dust and noise measurements.

Gabbro Screening & Classification — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Best circuit for Gabbro?

jaw + cone. Massive, abrasive; premium liners.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call