● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Construction waste Washing & Dewatering

Construction waste Washing & Dewatering. HAMAC configuration, equipment and cost guidance for processing Construction waste.

Overview

Construction waste (Mohs 3, ~60 MPa, low abrasion): processing steps, equipment and cost notes for plant buyers.

Overview — HAMAC crushing and grinding equipment reference
Overview — HAMAC crushing and grinding equipment reference.

Processing steps

  • Primary crushing — mobile jaw.
  • Secondary / tertiary — mobile jaw + impact + screen.
  • Screening for graded products.
  • Dewatering / handling.

Recommended equipment

  • Mobile Jaw Crusher Plant
  • Mobile Impact Crusher Plant

Cost notes

Operating cost is dominated by wear parts on low-abrasion material; choose liner grade by rock, not price.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialConstruction waste
Mohs hardness3
Compressive strength~60 MPa
AbrasivenessLow
Recommended circuitmobile jaw + impact + screen
Assumed dutycontract crushing on short-term sites
Evaluation horizonseven-year view

At contract crushing on short-term sites, the ranking of these parameters changes: lowest cost per tonne usually becomes the deciding constraint rather than the headline tonnage.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontract crushing on short-term sites
Primary objectivelowest cost per tonne
Evaluation horizonseven-year view
Site conditiona brownfield extension
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for construction waste crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Sequence delivery so foundations cure while the equipment is still in manufacture.
  2. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  3. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  4. Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
  5. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  6. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  7. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  8. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  9. Plan training for a rotating shift crew on CSS adjustment, liner change-out and lock-out / tag-out.

A realistic programme reserves time for permits, foundation curing and shipping to your market before any steel is cut.

From enquiry to the first saleable tonne — HAMAC crushing and grinding equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and grinding equipment reference.

What to verify before you sign

  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Guaranteed power draw and the lowest cost per tonne trade-off it implies.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.
  • Whether the quoted t/h is achieved at contract crushing on short-term sites or under ideal laboratory feed.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.

Score each supplier against the same ten items and keep the score sheet with the purchase file for the seven-year review.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages55%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Freight to your market is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Letting the contract crushing on short-term sites duty be defined verbally instead of in the contract.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.

Review the list with a rotating shift crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Measure and log the as-new CSS / setting for future wear comparison.
  2. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  3. Measure noise and dust at the operator position against the local limit.
  4. Check lubrication levels, grease lines and oil cooler operation.
  5. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  6. Record the baseline grading curve for each product fraction.
  7. Dry-run the plant empty for the specified period and record vibration.
  8. Confirm the direction and tension of every belt under no load.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Construction waste Washing & Dewatering — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Best circuit for Construction waste?

mobile jaw + impact + screen. Recycling concrete & asphalt; magnet + air sorter.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

Do you build plants for contract crushing on short-term sites?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Which wear-part grade should I order?

For construction waste (low abrasion), high-chrome iron is a common starting point; HAMAC confirms it in the technical proposal.

How is construction waste crushing sized for your target tonnage?

The plant is sized on saleable product at each fraction with a 10–20% surge allowance, then the model is confirmed from feed top size and material strength.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call