Overview
Quarries in Papua New Guinea typically process Gold ore, Limestone. The plant is sized to saleable tonnes per hour across 0–5, 5–10, 10–20 and 20–31.5 mm fractions rather than to crusher nameplate.

Scope of supply
- Primary jaw sized for the maximum feed lump.
- Secondary cone or impact matched to rock hardness.
- Multi-deck screens with adequate area for the fines fraction.
- Surge bin and controlled feed for consistent chamber load.
- Dust suppression and haul-road planning.
Market parameters for Papua New Guinea
| Item | Reference |
|---|---|
| Region | Oceania |
| Port | Lae |
| Voltage / frequency | 415V 50Hz |
| Standards | PNGS |
| Typical feed | Gold ore, Limestone |
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Destination port | Lae |
| Site supply | 415V 50Hz |
| Local standards | PNGS |
| Region | Oceania |
| Assumed duty | seasonal road-project supply |
| Evaluation horizon | seven-year view |
Where a value is shown as nominal, the written proposal states the guaranteed figure for your material, feed grading and seven-year operating plan.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | seasonal road-project supply |
| Primary objective | minimal civil works |
| Evaluation horizon | seven-year view |
| Site condition | a greenfield site |
| Operating team | a full-time plant team |
Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Check bearing and lubrication arrangements against the ambient temperature range at the site.
- Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
- Book container or flat-rack space to Lae and prepare the customs document set in advance.
- Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
- Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
- Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
- Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
- Choose compression or impact reduction according to hardness, silica content and required particle shape.
- Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
Each step has an owner and a document: flow sheet, general arrangement, foundation reference, packing list and acceptance protocol.
What to verify before you sign
- Dust and noise control designed to the local emission limits for Papua New Guinea.
- Whether the quoted t/h is achieved at seasonal road-project supply or under ideal laboratory feed.
- Liner alloy: Mn22 matched to the rock, not to the lowest purchase price.
- Nameplate data for 415V 50Hz and the PNGS certificate set.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
- Availability of a full-time plant team for liner changes and the lifting equipment on site.
- Written performance guarantee, sampling method and acceptance-test protocol.
- Guaranteed power draw and the minimal civil works trade-off it implies.
- Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
The relative weight of each item changes with the project: wear parts dominate on abrasive rock, availability dominates on remote sites.

Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 53% | Model size, number of stages and automation level |
| Ocean freight & insurance | 11% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 14% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 7% | kWh per tonne, local tariff and dust suppression water |
Treat the percentages as a budgeting shape, not a quotation: HAMAC prices the equipment list in writing once the flow sheet is fixed.
Mistakes that cost more than the machine
- Leaving tramp-iron protection out of the scope to save a small percentage of capital.
- Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
- Skipping a geotechnical check and discovering settlement under the primary crusher at a greenfield site.
- Assuming the manufacturer's warranty covers wear parts and consumables.
- Using one liner profile for both secondary and tertiary stages.
- Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
- Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
- Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
Review the list with a full-time plant team before the order is placed — they will recognise most of them.
Commissioning checklist
- Record power draw, tonnage and chamber pressure at steady state.
- Verify rotation direction on every motor before coupling.
- Hand over the spare-parts list, manuals and maintenance schedule.
- Record the baseline grading curve for each product fraction.
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Sample each product fraction and compare with the specification.
- Measure noise and dust at the operator position against the local limit.
- Check lubrication levels, grease lines and oil cooler operation.
On a greenfield site, allow extra time for the dust and noise measurements.