Overview
A 500–800 tph plant for construction waste (Mohs 3, ~60 MPa, low abrasion). Recommended circuit: mobile jaw + impact + screen.

Construction waste at this scale
| Capacity | 500–800 t/h |
|---|---|
| Material | Construction waste (Low abrasion) |
| Circuit | mobile jaw + impact + screen |
Equipment
- Mobile Jaw Crusher Plant
- Mobile Impact Crusher Plant
Notes
Recycling concrete & asphalt; magnet + air sorter.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Feed material | Construction waste |
| Mohs hardness | 3 |
| Compressive strength | ~60 MPa |
| Abrasiveness | Low |
| Recommended circuit | mobile jaw + impact + screen |
| Design capacity | 500–800 t/h |
| Typical main line | dual primary + multi-cone |
| Scale note | Large quarry / mine feed. |
| Assumed duty | demolition and recycling duties |
| Evaluation horizon | five-year view |
Use the table as a checklist when comparing quotations for construction waste crushing — a lower price often means one of these parameters was quietly reduced.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | demolition and recycling duties |
| Primary objective | strict product cubicity |
| Evaluation horizon | five-year view |
| Site condition | a confined urban yard |
| Operating team | a mixed local and expatriate team |
Change any one of these assumptions and the recommended configuration for construction waste crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Plan training for a mixed local and expatriate team on CSS adjustment, liner change-out and lock-out / tag-out.
- Lay out the dual primary + multi-cone arrangement with straight conveyor runs and crane access for liner changes.
- Apply mobile jaw + impact + screen; the reduction mechanism must suit low abrasion and a compressive strength near 60 MPa.
- Book shipping, prepare the packing list and confirm the container loading plan.
- Budget for water, dust extraction and spillage handling as part of the plant, not as an afterthought.
- Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
- Review the crusher chamber profile with the liner supplier against Construction waste (Mohs 3, ~60 MPa, low abrasion).
- Size the primary stage for 500–800 t/h with a 10–20% surge allowance — never on nameplate throughput alone.
- Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
Most delays at this stage come from missing feed data rather than from manufacturing capacity.

What to verify before you sign
- Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
- Written performance guarantee, sampling method and acceptance-test protocol.
- Availability of a mixed local and expatriate team for liner changes and the lifting equipment on site.
- Nameplate data for local voltage, frequency and the applicable conformity scheme.
- Liner alloy: high-chrome iron is a common starting point for construction waste at low abrasion.
- Decommissioning or relocation value at the end of a five-year horizon.
- Local service partner, technician travel time and visa requirements for your market.
- Wear-part interchangeability across machines in the same circuit.
- Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 55% | Model size, number of stages and automation level |
| Ocean freight & insurance | 8% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 14% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 8% | kWh per tonne, local tariff and dust suppression water |
Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.
Mistakes that cost more than the machine
- Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
- Buying on nameplate t/h without converting to saleable product at the specified fractions.
- Using one liner profile for both secondary and tertiary stages.
- Skipping a geotechnical check and discovering settlement under the primary crusher at a confined urban yard.
- Omitting a bypass chute, so a single screen fault stops the whole line.
- Buying strict product cubicity on price alone and losing it in availability.
- Overlooking dust, noise and water permits in your market until erection has already started.
- Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.
Review the list with a mixed local and expatriate team before the order is placed — they will recognise most of them.
Commissioning checklist
- Measure and log the as-new CSS / setting for future wear comparison.
- Check belt tracking, chute build-up and transfer-point dust.
- Confirm all guards, emergency stops and pull-wire switches function.
- Test emergency stops, pull wires and interlock trips in sequence.
- Measure noise and dust at the operator position against the local limit.
- Record power draw, tonnage and chamber pressure at steady state.
- Hand over the spare-parts list, manuals and maintenance schedule.
- Calibrate the belt scale and any level probes against a known load.
For a mixed local and expatriate team, run through this list twice — once with the supervisor and once without.