● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Crushing Limestone in Saudi Arabia

Limestone crushing plant in Saudi Arabia: jaw + impact, shipped to Jeddah at 380V 60Hz. HAMAC flow sheet and CIF quotation.

Overview

Limestone (Mohs 3, ~100 MPa) is processed in Saudi Arabia for aggregates, ore or industrial minerals. HAMAC configures the circuit to local conditions: Jeddah, 380V 60Hz, SASO.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Limestone properties

Limestone
PropertyValue
Mohs3
Compressive strength100 MPa
AbrasionLow
Circuitjaw + impact

In Saudi Arabia

  • Port: Jeddah.
  • Power: 380V 60Hz.
  • Standards: SASO.

Equipment

  • PE Series Jaw Crusher
  • PF Impact Crusher
  • Mobile Impact Crusher Plant

Budget

Send material, capacity and product sizes for a configured FOB/CIF budget to Jeddah.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialLimestone
Mohs hardness3
Compressive strength~100 MPa
AbrasivenessLow
Recommended circuitjaw + impact
Destination portJeddah
Site supply380V 60Hz
Local standardsSASO
RegionMiddle East
Assumed dutyhigh-tonnage aggregate supply
Evaluation horizonten-year view

Use the table as a checklist when comparing quotations for limestone crushing — a lower price often means one of these parameters was quietly reduced.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyhigh-tonnage aggregate supply
Primary objectivetight grading compliance
Evaluation horizonten-year view
Site conditionan existing quarry bench
Operating teama mixed local and expatriate team

Change any one of these assumptions and the recommended configuration for limestone crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  2. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  3. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  4. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  5. Apply jaw + impact; the reduction mechanism must suit low abrasion and a compressive strength near 100 MPa.
  6. Review the crusher chamber profile with the liner supplier against Limestone (Mohs 3, ~100 MPa, low abrasion).
  7. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  8. Plan training for a mixed local and expatriate team on CSS adjustment, liner change-out and lock-out / tag-out.
  9. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.

For a mixed local and expatriate team, the commissioning and training steps need more calendar time than the mechanical erection itself.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
  • Wear-part interchangeability across machines in the same circuit.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Decommissioning or relocation value at the end of a ten-year horizon.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.

Share this list with a mixed local and expatriate team as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages52%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Freight to Saudi Arabia is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Buying tight grading compliance on price alone and losing it in availability.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Overlooking dust, noise and water permits in Saudi Arabia until erection has already started.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Using one liner profile for both secondary and tertiary stages.
  • Assuming the manufacturer's warranty covers wear parts and consumables.

Review the list with a mixed local and expatriate team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Hand over the spare-parts list, manuals and maintenance schedule.
  2. Test emergency stops, pull wires and interlock trips in sequence.
  3. Sample each product fraction and compare with the specification.
  4. Confirm all guards, emergency stops and pull-wire switches function.
  5. Record power draw, tonnage and chamber pressure at steady state.
  6. Calibrate the belt scale and any level probes against a known load.
  7. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  8. Introduce feed in graded steps: 25%, 50%, 75%, then full load.

For a mixed local and expatriate team, run through this list twice — once with the supervisor and once without.

Crushing Limestone in Saudi Arabia: Plant, Supplier & Cost — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC supply a Limestone plant to Saudi Arabia?

Yes — equipment is delivered to Jeddah with SASO documentation.

How is limestone crushing shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Which wear-part grade should I order?

For limestone (low abrasion), Mn18 with ceramic inserts is a common starting point; HAMAC confirms it in the technical proposal.

What documents are needed for Saudi Arabia?

Packing list, commercial invoice, bill of lading, certificate of origin and the SASO documentation applicable to the machine.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call