Technical long-tail guide

HPT Multi-Cylinder Hydraulic Cone Crusher for Ukraine

HPT Multi-Cylinder Hydraulic Cone Crusher supplied to Ukraine: published model data, 380V 50Hz motors, DSTU documentation and delivery to Odessa. HAMAC factory quotation.

Overview

This page brings together the published HPT Multi-Cylinder Hydraulic Cone Crusher model data and the practical details of importing it into Ukraine — power supply, standards, shipping and commissioning. Popular feed materials in the market include Granite, Iron ore.

Overview — HAMAC cone crusher reference
Overview — HAMAC cone crusher reference.

Published HPT Multi-Cylinder Hydraulic Cone Crusher data

HPT Multi-Cylinder Hydraulic Cone Crusher nominal technical data
Published parameterNominal value
HPT10090 45–140
HPT200160 90–250
HPT300220 110–440
HPT400 / HPT500On request On request

Local conditions in Ukraine

  • Destination port: Odessa.
  • Site supply: 380V 50Hz.
  • Standards: DSTU.
  • Common materials: Granite, Iron ore.
  • Region: Europe.

Delivery scope

HAMAC quotes FOB, CFR or CIF to Odessa, sets motors and starters to 380V 50Hz, and supplies the certificate set applicable to DSTU. Workshop assembly, test, container loading plan and installation supervision are included in a turnkey scope.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portOdessa
Site supply380V 50Hz
Local standardsDSTU
RegionEurope
Machine lineHPT Multi-Cylinder Hydraulic Cone Crusher
CategoryCone Crusher
Assumed dutyseasonal road-project supply
Evaluation horizonten-year view

Ask for the same table from any competing supplier; without it, an offer for hpt multi-cylinder hydraulic cone crusher cannot be compared on scope.

Published HPT Multi-Cylinder Hydraulic Cone Crusher model data

HPT Multi-Cylinder Hydraulic Cone Crusher — nominal published data
ModelInstalled power (kW)Capacity range (t/h)Dimensions (mm)
HPT1009045–1401705 × 1510 × 1583
HPT20016090–2502135 × 1750 × 1927
HPT300220110–4402725 × 2110 × 2871
HPT400 / HPT500On requestOn requestOn request

Hydraulic multi-cylinder cone crusher for secondary and tertiary crushing of limestone through basalt, with 5–15% higher efficiency and 35–60% higher output than spring cone crushers. Read the table column by column against seasonal road-project supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for an existing quarry bench in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyseasonal road-project supply
Primary objectivefast mobilisation
Evaluation horizonten-year view
Site conditionan existing quarry bench
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for hpt multi-cylinder hydraulic cone crusher may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  2. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  3. Book container or flat-rack space to Odessa and prepare the customs document set in advance.
  4. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  5. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  6. Review the crusher chamber profile with the liner supplier against the feed material.
  7. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.
  8. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  9. Sequence delivery so foundations cure while the equipment is still in manufacture.

A realistic programme reserves time for permits, foundation curing and shipping to Ukraine before any steel is cut.

From enquiry to the first saleable tonne — HAMAC cone crusher reference
From enquiry to the first saleable tonne — HAMAC cone crusher reference.

What to verify before you sign

  • Nameplate data for 380V 50Hz and the DSTU certificate set.
  • Decommissioning or relocation value at the end of a ten-year horizon.
  • Control system language, telemetry and remote diagnostics availability.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Tramp-iron protection — hydraulic release, magnet and metal detection on the feed belt.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.

Score each supplier against the same ten items and keep the score sheet with the purchase file for the ten-year review.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

The weighting shifts with hardness and scale — a hard feed pushes the wear line up, while a larger plant pushes equipment share up.

Mistakes that cost more than the machine

  • Buying fast mobilisation on price alone and losing it in availability.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Using one liner profile for both secondary and tertiary stages.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.

On an existing quarry bench, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Confirm the direction and tension of every belt under no load.
  2. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  3. Calibrate the belt scale and any level probes against a known load.
  4. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  5. Check belt tracking, chute build-up and transfer-point dust.
  6. Check lubrication levels, grease lines and oil cooler operation.
  7. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  8. Record the baseline grading curve for each product fraction.

The commissioning record becomes the reference for every liner change in the ten-year plan.

HPT Multi-Cylinder Hydraulic Cone Crusher in Ukraine: Specs, Price & Delivery — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can the HPT Multi-Cylinder Hydraulic Cone Crusher be built for 380V 50Hz?

Yes — motors, starters and control panels are specified for 380V 50Hz before manufacture.

Where does HAMAC ship in Ukraine?

Standard delivery is quoted to Odessa; an alternative port can be agreed in the contract.

What documents are needed for Ukraine?

Packing list, commercial invoice, bill of lading, certificate of origin and the DSTU documentation applicable to the machine.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Do you build plants for seasonal road-project supply?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.