● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

PF Impact Crusher for UAE

PF Impact Crusher supplied to UAE: published model data, 415V 50Hz motors, ESMA documentation and delivery to Jebel Ali. HAMAC factory quotation.

Overview

This page brings together the published PF Impact Crusher model data and the practical details of importing it into UAE — power supply, standards, shipping and commissioning. Popular feed materials in the market include Limestone, Gabbro.

Overview — HAMAC impact crusher reference
Overview — HAMAC impact crusher reference.

Published PF Impact Crusher data

PF Impact Crusher nominal technical data
Published parameterNominal value
PF-1007Φ1000×700 mm 400×730 mm
PF-1010Φ1000×1050 mm 400×1080 mm
PF-1210Φ1250×1050 mm 400×1080 mm
PF-1214Φ1250×1400 mm 400×1430 mm
PF-1315Φ1320×1500 mm 860×1520 mm
PF-1520Φ1500×2000 mm 830×2040 mm

Local conditions in UAE

  • Destination port: Jebel Ali.
  • Site supply: 415V 50Hz.
  • Standards: ESMA.
  • Common materials: Limestone, Gabbro.
  • Region: Middle East.

Delivery scope

HAMAC quotes FOB, CFR or CIF to Jebel Ali, sets motors and starters to 415V 50Hz, and supplies the certificate set applicable to ESMA. Workshop assembly, test, container loading plan and installation supervision are included in a turnkey scope.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Destination portJebel Ali
Site supply415V 50Hz
Local standardsESMA
RegionMiddle East
Machine linePF Impact Crusher
CategoryImpact Crusher
Assumed dutycontinuous quarry production
Evaluation horizonten-year view

These values are the starting point for a written proposal on pf impact crusher; they are nominal and should be confirmed against a sample test before manufacture.

Published PF Impact Crusher model data

PF Impact Crusher — nominal published data
ModelRotor sizeFeed openingMax. Feeding sizeCapacityMotor PowerWeightOverall dimension
PF-1007Φ1000×700 mm400×730 mm300 mm30-70 t/h37-45 kW12 t2330×1660×2300 mm
PF-1010Φ1000×1050 mm400×1080 mm350 mm50-90 t/h45-55 kW15 t2370×1700×2390 mm
PF-1210Φ1250×1050 mm400×1080 mm350 mm70-130 t/h110 kW17.7 t2680×2160×2800 mm
PF-1214Φ1250×1400 mm400×1430 mm350 mm100-180 t/h132 kW22.4 t2650×2460×2800 mm
PF-1315Φ1320×1500 mm860×1520 mm500 mm130-250 t/h220 kW27 t3180×2720×2620 mm
PF-1520Φ1500×2000 mm830×2040 mm700 mm300-550 t/h315-400 kW50.6 t3959×3564×3330 mm
PF-1620Φ1600×2000 mm2000×1600 mm500 mm400-700 t/h400-500 kW58 t4259×3660×3450 mm
PF-1820Φ1800×2000 mm1260×2040 mm800 mm600-800 t/h630-710 kW83.21 t4400×3866×4009 mm

The impact crusher (impact crusher) is a new generation of impact crusher developed in combination with the specific working conditions of the sand and gravel. Read the table column by column against continuous quarry production: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a greenfield site in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycontinuous quarry production
Primary objectivelowest cost per tonne
Evaluation horizonten-year view
Site conditiona greenfield site
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for pf impact crusher may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  2. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  3. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  4. Sequence delivery so foundations cure while the equipment is still in manufacture.
  5. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  6. Review the crusher chamber profile with the liner supplier against the feed material.
  7. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  8. Confirm the haul-road and stockpile plan with a greenfield site in mind before fixing conveyor lengths.
  9. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.

For a rotating shift crew, the commissioning and training steps need more calendar time than the mechanical erection itself.

From enquiry to the first saleable tonne — HAMAC impact crusher reference
From enquiry to the first saleable tonne — HAMAC impact crusher reference.

What to verify before you sign

  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Decommissioning or relocation value at the end of a ten-year horizon.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.
  • Nameplate data for 415V 50Hz and the ESMA certificate set.

These are the items HAMAC puts in the technical proposal; if another offer is silent on them, ask why.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Buying lowest cost per tonne on price alone and losing it in availability.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.

Review the list with a rotating shift crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Measure noise and dust at the operator position against the local limit.
  2. Confirm the direction and tension of every belt under no load.
  3. Dry-run the plant empty for the specified period and record vibration.
  4. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  5. Check lubrication levels, grease lines and oil cooler operation.
  6. Calibrate the belt scale and any level probes against a known load.
  7. Sample each product fraction and compare with the specification.
  8. Verify rotation direction on every motor before coupling.

On a greenfield site, allow extra time for the dust and noise measurements.

PF Impact Crusher in UAE: Specs, Price & Delivery — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can the PF Impact Crusher be built for 415V 50Hz?

Yes — motors, starters and control panels are specified for 415V 50Hz before manufacture.

Where does HAMAC ship in UAE?

Standard delivery is quoted to Jebel Ali; an alternative port can be agreed in the contract.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call