Under 50 TPH Crushing Plant in Qatar

Under 50 TPH crushing plant supplied to Qatar via Hamad at 415V 50Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A under 50 tph crushing plant is a common size for Qatar. Main machines: small jaw + impact/cone, skid or mobile. Contractor and pilot scale, fast set-up.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • small jaw + impact/cone, skid or mobile
  • Shipped to Hamad.
  • Configured to 415V 50Hz / QCS.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Qatar

  • Port: Hamad.
  • Voltage: 415V 50Hz.
  • Standards: QCS.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity10–50 t/h
Typical main linesmall jaw + impact/cone, skid or mobile
Scale noteContractor and pilot scale, fast set-up.
Destination portHamad
Site supply415V 50Hz
Local standardsQCS
RegionMiddle East
Assumed dutycement raw-meal preparation
Evaluation horizonthree-year view

The figures above are transcribed from published HAMAC data and from the material properties of the feed; site measurements take precedence.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutycement raw-meal preparation
Primary objectivefast mobilisation
Evaluation horizonthree-year view
Site conditionan existing quarry bench
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Size the primary stage for 10–50 t/h with a 10–20% surge allowance — never on nameplate throughput alone.
  2. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  3. Lay out the small jaw + impact/cone, skid or mobile arrangement with straight conveyor runs and crane access for liner changes.
  4. Review the crusher chamber profile with the liner supplier against the feed material.
  5. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  6. Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
  7. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  8. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  9. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.

The sequence is deliberately front-loaded — decisions taken before manufacture are cheap, changes made on site are not.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Local service partner, technician travel time and visa requirements for Qatar.
  • Guaranteed power draw and the fast mobilisation trade-off it implies.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Liner alloy: Mn13 matched to the rock, not to the lowest purchase price.
  • Product sampling points and the lab equipment needed for routine grading checks.

Share this list with a small contractor crew as well as procurement; operators are the ones who live with the omissions.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages49%Model size, number of stages and automation level
Ocean freight & insurance12%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training8%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Letting the cement raw-meal preparation duty be defined verbally instead of in the contract.
  • Assuming a mobile plant can match a stationary line on high-tonnage, multi-product duty.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.

Review the list with a small contractor crew before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Sample each product fraction and compare with the specification.
  2. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  3. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  4. Measure and log the as-new CSS / setting for future wear comparison.
  5. Calibrate the belt scale and any level probes against a known load.
  6. Confirm the direction and tension of every belt under no load.
  7. Test emergency stops, pull wires and interlock trips in sequence.
  8. Measure noise and dust at the operator position against the local limit.

The commissioning record becomes the reference for every liner change in the three-year plan.

Under 50 TPH Crushing Plant in Qatar — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a Under 50 TPH plant to Qatar?

Yes — to Hamad with QCS documentation.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.