500–800 TPH Crushing Plant in Myanmar

500–800 TPH crushing plant supplied to Myanmar via Yangon at 380V 50Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A 500–800 tph crushing plant is a common size for Myanmar. Main machines: dual primary + multi-cone. Large quarry / mine feed.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • dual primary + multi-cone
  • Shipped to Yangon.
  • Configured to 380V 50Hz / MSS.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Myanmar

  • Port: Yangon.
  • Voltage: 380V 50Hz.
  • Standards: MSS.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity500–800 t/h
Typical main linedual primary + multi-cone
Scale noteLarge quarry / mine feed.
Destination portYangon
Site supply380V 50Hz
Local standardsMSS
RegionAsia
Assumed dutyhigh-tonnage aggregate supply
Evaluation horizonfive-year view

The figures above are transcribed from published HAMAC data and from the material properties of the feed; site measurements take precedence.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyhigh-tonnage aggregate supply
Primary objectivestrict product cubicity
Evaluation horizonfive-year view
Site conditiona remote mine site
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Sequence delivery so foundations cure while the equipment is still in manufacture.
  2. Review the crusher chamber profile with the liner supplier against the feed material.
  3. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  4. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  5. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  6. Book container or flat-rack space to Yangon and prepare the customs document set in advance.
  7. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  8. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  9. Size the primary stage for 500–800 t/h with a 10–20% surge allowance — never on nameplate throughput alone.

On high-tonnage aggregate supply, step ordering matters: survey and sampling must precede the equipment list, or the plant is sized to a guess.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Decommissioning or relocation value at the end of a five-year horizon.
  • Nameplate data for 380V 50Hz and the MSS certificate set.
  • Ambient temperature, altitude and dust load derating for motors and hydraulics.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Control system language, telemetry and remote diagnostics availability.
  • Local service partner, technician travel time and visa requirements for Myanmar.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Liner alloy: Mn13 matched to the rock, not to the lowest purchase price.

Score each supplier against the same ten items and keep the score sheet with the purchase file for the five-year review.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages53%Model size, number of stages and automation level
Ocean freight & insurance11%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

On high-tonnage aggregate supply, the strict product cubicity objective changes which line deserves the most attention during value engineering.

Mistakes that cost more than the machine

  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches 500–800 t/h.
  • Using one liner profile for both secondary and tertiary stages.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Letting the high-tonnage aggregate supply duty be defined verbally instead of in the contract.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Overlooking dust, noise and water permits in Myanmar until erection has already started.

Every item on this list has cost someone a commissioning date; none of them requires new technology to avoid.

Commissioning checklist

  1. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  2. Check lubrication levels, grease lines and oil cooler operation.
  3. Dry-run the plant empty for the specified period and record vibration.
  4. Confirm the direction and tension of every belt under no load.
  5. Record the baseline grading curve for each product fraction.
  6. Measure and log the as-new CSS / setting for future wear comparison.
  7. Verify rotation direction on every motor before coupling.
  8. Record power draw, tonnage and chamber pressure at steady state.

On a remote mine site, allow extra time for the dust and noise measurements.

500–800 TPH Crushing Plant in Myanmar — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 500–800 TPH plant to Myanmar?

Yes — to Yangon with MSS documentation.

How is the crushing and screening plant shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

What does the warranty cover?

Manufacturing defects on the machine are covered for the stated period; wear parts, consumables and damage from uncrushable feed are excluded.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

How do I estimate operating cost per tonne?

Track kWh, tonnes per liner set, labour hours and downtime for at least one quarter, then divide total cost by saleable tonnes.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.