50–100 TPH Crushing Plant in Egypt

50–100 TPH crushing plant supplied to Egypt via Alexandria at 380V 50Hz. HAMAC equipment list, layout and CIF quotation.

Overview

A 50–100 tph crushing plant is a common size for Egypt. Main machines: PE jaw + PF impact / cone + 2-deck screen. Small quarries and concrete plants.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • PE jaw + PF impact / cone + 2-deck screen
  • Shipped to Alexandria.
  • Configured to 380V 50Hz / EOS.

Selection

  • Size to saleable t/h +10–20% surge.
  • Hard rock → jaw+cone; soft → jaw+impact.
  • Add VSI for sand/shape.

For Egypt

  • Port: Alexandria.
  • Voltage: 380V 50Hz.
  • Standards: EOS.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity50–100 t/h
Typical main linePE jaw + PF impact / cone + 2-deck screen
Scale noteSmall quarries and concrete plants.
Destination portAlexandria
Site supply380V 50Hz
Local standardsEOS
RegionAfrica
Assumed dutymanufactured-sand production
Evaluation horizonten-year view

At manufactured-sand production, the ranking of these parameters changes: maximum mechanical availability usually becomes the deciding constraint rather than the headline tonnage.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivemaximum mechanical availability
Evaluation horizonten-year view
Site conditionan existing quarry bench
Operating teaman owner-operator team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Specify motors, starters and documentation for 380V 50Hz and EOS before manufacture.
  2. Plan training for an owner-operator team on CSS adjustment, liner change-out and lock-out / tag-out.
  3. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  4. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  5. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  6. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  7. Confirm the haul-road and stockpile plan with an existing quarry bench in mind before fixing conveyor lengths.
  8. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  9. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.

A realistic programme reserves time for permits, foundation curing and shipping to Egypt before any steel is cut.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Liner alloy: Mn13 matched to the rock, not to the lowest purchase price.
  • Whether the quoted t/h is achieved at manufactured-sand production or under ideal laboratory feed.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
  • Wear-part interchangeability across machines in the same circuit.
  • Nameplate data for 380V 50Hz and the EOS certificate set.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Screen deck count, aperture and area; ask for the efficiency calculation, not just the mesh size.
  • Maximum feed lump and gradation — a chamber that cannot accept the top size will bridge on day one.

Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages50%Model size, number of stages and automation level
Ocean freight & insurance12%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Overlooking dust, noise and water permits in Egypt until erection has already started.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Buying maximum mechanical availability on price alone and losing it in availability.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches 50–100 t/h.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Omitting a bypass chute, so a single screen fault stops the whole line.

On an existing quarry bench, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Sample each product fraction and compare with the specification.
  2. Confirm the direction and tension of every belt under no load.
  3. Check belt tracking, chute build-up and transfer-point dust.
  4. Confirm all guards, emergency stops and pull-wire switches function.
  5. Dry-run the plant empty for the specified period and record vibration.
  6. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  7. Hand over the spare-parts list, manuals and maintenance schedule.
  8. Calibrate the belt scale and any level probes against a known load.

Keep the signed record; it is the only defensible baseline for later performance disputes.

50–100 TPH Crushing Plant in Egypt — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Can HAMAC deliver a 50–100 TPH plant to Egypt?

Yes — to Alexandria with EOS documentation.

How is the crushing and screening plant shipped?

Machines are packed by a container loading plan; large frames may travel as out-of-gauge cargo on flat racks, with lifting points and sea-fastening documented.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

Do you build plants for manufactured-sand production?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.