What is Lead time?
Lead time is the period from a confirmed order and technical approval to the equipment being ready for shipment. In a crushing or grinding plant this figure is used during equipment selection, not after installation. The same machine can therefore produce different results on two quarries.
The term is used in flow-sheet design, equipment selection and acceptance testing. It should be stated in writing with the conditions that start the clock. HAMAC engineers state the reference conditions alongside every nominal figure.

Typical values and how lead time is measured
The figures below are indicative engineering ranges published for selection purposes. They are nominal values, not contractual guarantees, and must be confirmed in a written proposal for a specific material. Measurements should be taken over a full shift, not from a single spot sample.
| Parameter | Indicative value |
|---|---|
| Start point | signed drawings + deposit |
| End point | ex-works / FOB readiness |
| Dependencies | castings, motors, special steels |
Reporting basis: days / weeks. Custom chambers, special motors and paint systems extend the schedule. When comparing two figures, check that the sampling method, sieve standard and reference conditions are the same.
Why lead time matters in plant selection
- It should be stated in writing with the conditions that start the clock.
- Custom chambers, special motors and paint systems extend the schedule.
- Civil works and shipping bookings can run in parallel with manufacturing.
Civil works and shipping bookings can run in parallel with manufacturing. The same machine can therefore produce different results on two quarries. HAMAC engineers state the reference conditions alongside every nominal figure.
Applying lead time in a HAMAC plant
HAMAC engineers fix this value against raw material, feed gradation, moisture, required product sizes and site conditions. Lead time is the period from a confirmed order and technical approval to the equipment being ready for shipment. In a crushing or grinding plant this figure is used during equipment selection, not after installation.
A typical line runs vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Grinding circuits add a mill, classifier and dust collection. It should be stated in writing with the conditions that start the clock.
All figures published on this site are nominal engineering values. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency. HAMAC engineers state the reference conditions alongside every nominal figure.

How to verify lead time on site
Start with a written test condition: which material, which sieve standard, which sample size and which operating state produced the number. Measurements should be taken over a full shift, not from a single spot sample. Without that, two figures can both be correct and still disagree.
- Record the value at commissioning together with feeder rate, crusher setting and screen media. Custom chambers, special motors and paint systems extend the schedule.
- Repeat the measurement after a liner change, a change of feed face or a shift in moisture, and compare like with like.
- Convert the result into output or cost per saleable tonne before deciding whether an adjustment is worthwhile.
If a quoted figure and a measured figure disagree, check the reference conditions first. Most disputes come from different test methods rather than from faulty equipment. HAMAC engineers state the reference conditions alongside every nominal figure.