What is FAT (factory acceptance test)?
A factory acceptance test is a documented inspection and functional check carried out at the manufacturer before shipment. In a crushing or grinding plant this figure is used during equipment selection, not after installation. In practice, the feed is never as uniform as a laboratory sample.
The term is used in flow-sheet design, equipment selection and acceptance testing. It is the buyer’s last low-cost opportunity to find a nonconformity. Treat the figure as a starting point for a plant design, not as a guarantee.

Typical values and how fat (factory acceptance test) is measured
The figures below are indicative engineering ranges published for selection purposes. They are nominal values, not contractual guarantees, and must be confirmed in a written proposal for a specific material. Measurements should be taken over a full shift, not from a single spot sample.
| Parameter | Indicative value |
|---|---|
| Documentation | checklists, certificates, photos |
| Functional checks | rotation, hydraulics, controls |
| Output | signed FAT report + punch list |
Reporting basis: inspection stage. A FAT report should name the exact machine serial numbers. When comparing two figures, check that the sampling method, sieve standard and reference conditions are the same.
Why fat (factory acceptance test) matters in plant selection
- It is the buyer’s last low-cost opportunity to find a nonconformity.
- A FAT report should name the exact machine serial numbers.
- Witnessed or remote FAT is a common requirement for export projects.
Witnessed or remote FAT is a common requirement for export projects. In practice, the feed is never as uniform as a laboratory sample. Treat the figure as a starting point for a plant design, not as a guarantee.
Applying fat (factory acceptance test) in a HAMAC plant
HAMAC engineers fix this value against raw material, feed gradation, moisture, required product sizes and site conditions. A factory acceptance test is a documented inspection and functional check carried out at the manufacturer before shipment. In a crushing or grinding plant this figure is used during equipment selection, not after installation.
A typical line runs vibrating feeder → primary jaw crusher → secondary cone or impact crusher → multi-deck vibrating screen → belt conveyors, with oversize returned in closed circuit. Grinding circuits add a mill, classifier and dust collection. It is the buyer’s last low-cost opportunity to find a nonconformity.
All figures published on this site are nominal engineering values. Actual performance depends on feed gradation, moisture, crusher setting and screening efficiency. Treat the figure as a starting point for a plant design, not as a guarantee.

How to verify fat (factory acceptance test) on site
Start with a written test condition: which material, which sieve standard, which sample size and which operating state produced the number. Measurements should be taken over a full shift, not from a single spot sample. Without that, two figures can both be correct and still disagree.
- Record the value at commissioning together with feeder rate, crusher setting and screen media. A FAT report should name the exact machine serial numbers.
- Repeat the measurement after a liner change, a change of feed face or a shift in moisture, and compare like with like.
- Convert the result into output or cost per saleable tonne before deciding whether an adjustment is worthwhile.
If a quoted figure and a measured figure disagree, check the reference conditions first. Most disputes come from different test methods rather than from faulty equipment. Treat the figure as a starting point for a plant design, not as a guarantee.