● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

100–200 TPH Manufactured Sand Plant

100–200 TPH Manufactured Sand Plant (VSI). HAMAC PE/PEW jaw + cone + 3-deck screen. Free flow sheet and quotation within 24 hours.

Overview

A 100–200 tph crushing plant is one of the most requested export sizes. Main machines: PE/PEW jaw + cone + 3-deck screen. Most common export plant size.

Overview — HAMAC VSI sand making machine reference
Overview — HAMAC VSI sand making machine reference.

VSI sand stage

For manufactured sand at 100–200 tph, a VSI shapes the fine fraction and controls flakiness; pair it after the cone.

Sand grading

  • Control fineness modulus via rotor speed and anvil.
  • Wash (wheel/screw) when clay is present.
  • Dewater and stockpile.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity100–200 t/h
Typical main linePE/PEW jaw + cone + 3-deck screen
Scale noteMost common export plant size.
Assumed dutydemolition and recycling duties
Evaluation horizonsingle-project view

The figures above are transcribed from published HAMAC data and from the material properties of the feed; site measurements take precedence.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutydemolition and recycling duties
Primary objectivefast mobilisation
Evaluation horizonsingle-project view
Site conditiona remote mine site
Operating teama full-time plant team

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Confirm the haul-road and stockpile plan with a remote mine site in mind before fixing conveyor lengths.
  2. Choose compression or impact reduction according to hardness, silica content and required particle shape.
  3. Sequence delivery so foundations cure while the equipment is still in manufacture.
  4. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  5. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  6. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  7. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  8. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.
  9. Plan training for a full-time plant team on CSS adjustment, liner change-out and lock-out / tag-out.

Shortening this sequence is possible on a remote mine site, but only where the feed and product specification are already fully defined.

What to verify before you sign

  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Availability of a full-time plant team for liner changes and the lifting equipment on site.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Whether the quoted t/h is achieved at demolition and recycling duties or under ideal laboratory feed.

Bring this list to the design review — it is cheaper to resolve an omission on paper than during commissioning.

What to verify before you sign — HAMAC VSI sand making machine reference
What to verify before you sign — HAMAC VSI sand making machine reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages52%Model size, number of stages and automation level
Ocean freight & insurance9%Destination port, container count and out-of-gauge cargo
Civil works & foundations9%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training8%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables7%kWh per tonne, local tariff and dust suppression water

Include downtime in the model. An unplanned liner change on a remote site costs far more than the casting itself.

Mistakes that cost more than the machine

  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a remote mine site.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Buying fast mobilisation on price alone and losing it in availability.
  • Forgetting surge capacity — an intermittent loader starves the chamber and ruins particle shape.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches 100–200 t/h.

Review the list with a full-time plant team before the order is placed — they will recognise most of them.

Commissioning checklist

  1. Measure and log the as-new CSS / setting for future wear comparison.
  2. Agree the punch list, sign the hand-over protocol and file the as-built drawings.
  3. Check belt tracking, chute build-up and transfer-point dust.
  4. Hand over the spare-parts list, manuals and maintenance schedule.
  5. Verify rotation direction on every motor before coupling.
  6. Confirm all guards, emergency stops and pull-wire switches function.
  7. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  8. Check lubrication levels, grease lines and oil cooler operation.

Keep the signed record; it is the only defensible baseline for later performance disputes.

100–200 TPH Manufactured Sand Plant (VSI) — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

What equipment for a 100–200 TPH plant?

PE/PEW jaw + cone + 3-deck screen

How much does a 100–200 TPH plant cost?

Cost follows the exact specification; request a configured FOB/CIF budget from HAMAC.

Does HAMAC provide spare parts after the warranty?

Yes — original matched wear parts and consumables are supplied for the life of the machine, with a recommended stock list.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

Can the plant be expanded later?

Yes — conveyors, screen area and foundations should be sized in the first phase so a second cone or VSI can be added without rebuilding the line.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call