Above 800 TPH Crushing Plant Configuration

Above 800 TPH Crushing Plant Configuration & Equipment List. HAMAC gyratory primary + SAG feed. Free flow sheet and quotation within 24 hours.

Overview

A above 800 tph crushing plant is one of the most requested export sizes. Main machines: gyratory primary + SAG feed. Mine-scale, often with HPGR.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Main equipment

  • gyratory primary + SAG feed
  • Feeders and multiple screens for 3–4 products.
  • Conveyors, control cabinet and (recommended) dust suppression.

How to select

  • Base capacity on SALEABLE t/h at required sizes, +10–20% surge.
  • Hard rock → jaw + cone; soft rock → jaw + impact.
  • Add VSI only when sand / shape is required.

Above 800 TPH reference

Above 800 TPH reference
Capacity bandTypical main machinesNote
Above 800 TPHgyratory primary + SAG feedMine-scale, often with HPGR.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Design capacity800–1500 t/h
Typical main linegyratory primary + SAG feed
Scale noteMine-scale, often with HPGR.
Assumed dutymanufactured-sand production
Evaluation horizonfive-year view

Ask for the same table from any competing supplier; without it, an offer for the crushing and screening plant cannot be compared on scope.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymanufactured-sand production
Primary objectivefast mobilisation
Evaluation horizonfive-year view
Site conditiona brownfield extension
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Define the acceptance test: sampling points, test duration, moisture range and who signs the protocol.
  2. Plan training for a rotating shift crew on CSS adjustment, liner change-out and lock-out / tag-out.
  3. Lay out the gyratory primary + SAG feed arrangement with straight conveyor runs and crane access for liner changes.
  4. Survey the feed: the feed material; record top size, bulk density, moisture and clay content before fixing the flow sheet.
  5. Log tonnes per liner set and kWh per tonne from day one so you have a real cost baseline within a quarter.
  6. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  7. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  8. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  9. Size the primary stage for 800–1500 t/h with a 10–20% surge allowance — never on nameplate throughput alone.

Most delays at this stage come from missing feed data rather than from manufacturing capacity.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • Whether the quoted t/h is achieved at manufactured-sand production or under ideal laboratory feed.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Dust and noise control designed to the local emission limits for your market.
  • Closed-side setting range and whether automatic setting regulation is included.
  • Guaranteed power draw and the fast mobilisation trade-off it implies.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.

For manufactured-sand production, give the fast mobilisation line extra weight; a generic checklist will not rank the offers correctly.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages57%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables6%kWh per tonne, local tariff and dust suppression water

Freight to your market is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Letting the manufactured-sand production duty be defined verbally instead of in the contract.
  • Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
  • Specifying motors for the wrong voltage or frequency and rewinding them on site.
  • Buying fast mobilisation on price alone and losing it in availability.
  • Undersizing the screen, then blaming the crusher for a plant that never reaches 800–1500 t/h.
  • Assuming the manufacturer's warranty covers wear parts and consumables.

For manufactured-sand production, protect the fast mobilisation requirement explicitly in the contract documents.

Commissioning checklist

  1. Record the baseline grading curve for each product fraction.
  2. Record power draw, tonnage and chamber pressure at steady state.
  3. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  4. Dry-run the plant empty for the specified period and record vibration.
  5. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  6. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  7. Measure noise and dust at the operator position against the local limit.
  8. Calibrate the belt scale and any level probes against a known load.

Keep the signed record; it is the only defensible baseline for later performance disputes.

Above 800 TPH Crushing Plant Configuration & Equipment List — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

What equipment for a Above 800 TPH plant?

gyratory primary + SAG feed

How much does a Above 800 TPH plant cost?

Cost follows the exact specification; request a configured FOB/CIF budget from HAMAC.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

Which wear-part grade should I order?

The grade follows the rock: manganese for impact duty, high-chrome for low-impact abrasion; HAMAC confirms it in the technical proposal.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

How should I compare two quotations?

Normalise the incoterm, capacity basis, motor specification, spares list and erection scope first; only then compare the price.

Which product fractions should I specify?

List every required fraction and its share of output. Screen area and deck count follow from the fines fraction, not from total tonnage.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.