Technical long-tail guide

Soft Rock Crushing Solutions

Soft Rock: Crushing & Screening Solutions. HAMAC equipment, configuration and cost for Soft Rock. Reference data, workflow and a project-specific cost model.

Overview

Impact crushing for shape at low cost. HAMAC designs crushing, screening and grinding circuits for soft rock across capacities.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

Scope

  • Limestone (Mohs 3, ~100 MPa)
  • Marble (Mohs 3, ~90 MPa)
  • Dolomite (Mohs 3.5, ~110 MPa)

Typical flow

Feed → primary → secondary/tertiary → screening → (VSI / grinding) → stockpile.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
ApplicationSoft Rock
Typical feedLimestone, Marble, Dolomite
Assumed dutymine pre-beneficiation feed
Evaluation horizonsingle-project view

These values are the starting point for a written proposal on the crushing and screening plant; they are nominal and should be confirmed against a sample test before manufacture.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutymine pre-beneficiation feed
Primary objectivetight grading compliance
Evaluation horizonsingle-project view
Site conditionan existing quarry bench
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for the crushing and screening plant may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Book shipping, prepare the packing list and confirm the container loading plan.
  2. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  3. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  4. Check bearing and lubrication arrangements against the ambient temperature range at the site.
  5. Plan training for a rotating shift crew on CSS adjustment, liner change-out and lock-out / tag-out.
  6. Set the maintenance stock list from the expected wear rate, not from a percentage of the equipment price.
  7. Size the primary stage for your target tonnage with a 10–20% surge allowance — never on nameplate throughput alone.
  8. Set the closed-side setting or rotor speed against the required product fractions, then verify the expected reduction ratio.
  9. Lay out conveyors, access ways, stockpile capacity and drainage before ordering steelwork.

Each step has an owner and a document: flow sheet, general arrangement, foundation reference, packing list and acceptance protocol.

What to verify before you sign

  • Control system language, telemetry and remote diagnostics availability.
  • Saleable tonnes per hour at each product size, not gross crusher throughput, for your target tonnage.
  • Dust and noise control designed to the local emission limits for your market.
  • Decommissioning or relocation value at the end of a single-project horizon.
  • Spare motor, gearbox and hydraulic pump lead times from the nearest HAMAC stock point.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.
  • Local service partner, technician travel time and visa requirements for your market.
  • Energy draw in kW and the expected kWh per tonne at the design duty.
  • After-sales response time, technician availability and the warranty exclusions in writing.

The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.

What to verify before you sign — HAMAC crushing and screening equipment reference
What to verify before you sign — HAMAC crushing and screening equipment reference.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Freight to your market is volatile; ask for the quotation to state validity and the port basis rather than a single delivered number.

Mistakes that cost more than the machine

  • Using one liner profile for both secondary and tertiary stages.
  • Comparing quotations with different port terms and calling the lower number cheaper.
  • Buying on nameplate t/h without converting to saleable product at the specified fractions.
  • Buying tight grading compliance on price alone and losing it in availability.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Selecting the cheapest liner alloy for hard, high-silica rock and paying for it in change-outs.

On an existing quarry bench, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Verify rotation direction on every motor before coupling.
  2. Record power draw, tonnage and chamber pressure at steady state.
  3. Record the baseline grading curve for each product fraction.
  4. Confirm all guards, emergency stops and pull-wire switches function.
  5. Dry-run the plant empty for the specified period and record vibration.
  6. Sample each product fraction and compare with the specification.
  7. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  8. Measure noise and dust at the operator position against the local limit.

On an existing quarry bench, allow extra time for the dust and noise measurements.

Soft Rock: Crushing & Screening Solutions — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Best crusher for Soft Rock?

Impact crushing for shape at low cost.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

Do you build plants for mine pre-beneficiation feed?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

Can HAMAC supply a complete flow sheet and layout?

Yes — a flow sheet, general arrangement, foundation reference and equipment list are supplied with the budget quotation.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call