Construction & demolition waste greenfield plant: Frequent site relocation — solution & design basis

A stationary plant cannot follow the working face economically — a 220 t/h design basis, configuration and acceptance checks.

Construction & demolition waste greenfield plant with frequent site relocation is normally resolved by checking the circuit against the saleable product specification first: use wheel or tracked units with on-board screens. For a 220 t/h design point on construction & demolition waste, HAMAC would review mobile impact + magnet + picking → screen, then confirm the settings with a written acceptance test. On site, feed variability hides problems that a test sample never shows.

220 t/hindicative design point
variablecompressive strength
200–400 t/hscenario capacity band
650 kWorder-of-magnitude installed power
Key takeaways
  1. Construction & demolition waste is variable in abrasiveness and variable in moisture sensitivity; Rebar, timber and plastics make feedstock variability the design driver; a forgiving impact chamber beats an optimised cone.
  2. For greenfield plant the priority is a verifiable mass balance, constrained by an untested feed gradation and a fixed commissioning date.
  3. Frequent site relocation typically appears as: a stationary plant cannot follow the working face economically.
  4. First corrective action: use wheel or tracked units with on-board screens.
  5. All values are nominal; confirm them in a written proposal with a defined test method.

Design basis for construction & demolition waste greenfield plant

The design basis starts with the rock, not the machine. Construction & demolition waste is rated at variable compressive strength with variable abrasiveness, variable moisture sensitivity and a loose bulk density around 1.20 t/m³. Rebar, timber and plastics make feedstock variability the design driver; a forgiving impact chamber beats an optimised cone. A change in one stage changes the circulating load in all the others.

A greenfield plant must fix the entire flow sheet before civil works begin, constrained by an untested feed gradation and a fixed commissioning date. The commercial priority is a verifiable mass balance. For this combination HAMAC works from an indicative design point of 220 t/h of saleable product, with a maximum feed top size near 400 mm and target fractions of 0–4, 4–20, 20–40 mm recycled aggregate.

Construction & demolition waste — design basis (nominal values)
ParameterIndicative value / method
Raw materialConstruction & demolition waste · variable · abrasion variable
Design throughput220 t/h saleable product (200–400 t/h scenario band)
Maximum feed size~400 mm
Target product0–4, 4–20, 20–40 mm recycled aggregate
Loose bulk density1.20 t/m³
Suggested circuitmobile impact + magnet + picking → screen
Construction & demolition waste greenfield plant — Design basis for construction & demolition waste greenfield plant — HAMAC mobile crushing plant
Construction & demolition waste greenfield plant — Design basis for construction & demolition waste greenfield plant — HAMAC mobile crushing plant reference.

Why frequent site relocation appears in this circuit

A stationary plant cannot follow the working face economically. In a construction & demolition waste greenfield plant this is usually a system symptom rather than a single machine fault. On site, feed variability hides problems that a test sample never shows.

  • haul distance grows as the face advances
  • civil foundations make relocation a major project
  • the contract duration is shorter than the plant payback period

The reference conditions should be attached to every figure quoted. Before changing a crusher setting, check these in order: 1) time a full move from stop to first feed; 2) verify transport width and axle loads for local roads; 3) confirm set-up can be done with the site crane available. Ask for the mass balance and the test method behind any quoted number.

Recommended equipment configuration

For construction & demolition waste at 220 t/h the working train is mobile impact + magnet + picking → screen. The equipment list is fixed only after feed gradation, moisture and saleable fractions are confirmed — the same nominal capacity can require different crushers for construction & demolition waste and for a softer rock. A change in one stage changes the circulating load in all the others.

Indicative stage configuration
ParameterIndicative value / method
FeedingVibrating grizzly feeder, VFD control, ~275 t/h design margin
Primary reductionJaw / impact crusher, nominal CSS ~30 mm at the secondary stage
Secondary / tertiaryscreen
ScreeningMulti-deck screen sized for 40% circulating load
ConveyingBelts sized for fresh feed + return stream, 1.20 t/m³ bulk density
ControlInterlocked start-up, power-based feed trim, 650 kW order-of-magnitude connected load

The corrective actions for frequent site relocation are applied on top of this base circuit: use wheel or tracked units with on-board screens; design modular skids that fit standard container dimensions; standardise electrical plug-in connections between modules.

Construction & demolition waste greenfield plant — Recommended equipment configuration — HAMAC mobile crushing plant
Construction & demolition waste greenfield plant — Recommended equipment configuration — HAMAC mobile crushing plant reference.

Operating settings and acceptance checks

Settings must be recorded at commissioning and re-checked after every liner change. For this circuit the starting point is a secondary CSS near 30 mm, a circulating load around 40% and a screen efficiency target above 90%. The reference conditions should be attached to every figure quoted.

  • Time a full move from stop to first feed
  • Verify transport width and axle loads for local roads
  • Confirm set-up can be done with the site crane available
Acceptance checks to write into the contract
ParameterIndicative value / method
CapacityMeasured over a full shift, saleable tonnes, 220 t/h nominal
GradingFull sieve analysis, agreed standard, 0–4, 4–20, 20–40 mm recycled aggregate
Crusher settingCSS measured and logged, ~30 mm starting point
PowerMain-drive current at steady feed, 650 kW connected load
WearLiner mass before and after, cost per saleable tonne

Ask for the mass balance and the test method behind any quoted number. All figures published on this site are nominal engineering values; actual performance depends on feed gradation, moisture, crusher setting and screening efficiency.

Cost, risk and what to confirm in writing

Compare this plant as cost per saleable tonne, not purchase price. Energy, wear parts, labour and downtime dominate the operating cost for construction & demolition waste, while a verifiable mass balance determines how much lost production actually costs. On site, feed variability hides problems that a test sample never shows.

  • Ask every supplier for the same flow sheet and mass balance, including the 40% return stream.
  • State the Incoterm, named port, civils scope, erection scope and a two-year spares list in the quotation.
  • Model annual output as 220 t/h × scheduled hours × realistic utilisation (often 75–90%), not as nameplate × 8,760 hours.
  • Agree the sampling method, sieve standard and acceptance test before the order is placed.

A change in one stage changes the circulating load in all the others. Ask for the mass balance and the test method behind any quoted number. Send your material, feed size, target capacity and product sizes to HAMAC Machinery for a comparable configuration and budget.

Construction & demolition waste greenfield plant — Cost, risk and what to confirm in writing — HAMAC mobile crushing plant
Construction & demolition waste greenfield plant — Cost, risk and what to confirm in writing — HAMAC mobile crushing plant reference.
FAQ

Construction & demolition waste greenfield plant — questions answered

Direct answers to the questions buyers ask most often.

What causes frequent site relocation in a construction & demolition waste greenfield plant?

A stationary plant cannot follow the working face economically. The usual causes are haul distance grows as the face advances; civil foundations make relocation a major project; the contract duration is shorter than the plant payback period. use wheel or tracked units with on-board screens.

Which crusher train suits construction & demolition waste at 200–400 t/h?

A typical configuration is mobile impact + magnet + picking → screen. Rebar, timber and plastics make feedstock variability the design driver; a forgiving impact chamber beats an optimised cone. The final list depends on feed gradation, moisture, product fractions and local power and space limits.

What should be confirmed before ordering a 220 t/h plant?

A written flow sheet and mass balance, the product grading standard, CSS and screen media, installed power and starting method, the Incoterm and named port, a spares list, and an acceptance test with a defined sampling method. All published figures are nominal.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Ask an engineer about this configuration

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Have the feed data for your own site?

Send material, maximum feed size, target t/h and required fractions — a HAMAC engineer will return a written flow sheet and budget.