Construction waste Crushing Plant Configuration

Construction waste Crushing Plant Configuration & Flow Sheet. HAMAC mobile jaw + impact + screen configuration, equipment list and budget quotation.

Overview

A practical Construction waste crushing plant configuration by capacity, with the equipment list and screening setup that HAMAC typically specifies.

Overview — HAMAC crushing and screening equipment reference
Overview — HAMAC crushing and screening equipment reference.

30–100 t/h

  • Primary jaw (PE series).
  • Secondary impact or small cone.
  • 2-deck screen for 2–3 products.
  • Wheel or tracked for mobility.

100–300 t/h

  • Primary jaw + secondary cone.
  • 3-deck screen, multiple fractions.
  • Dust control and conveyors.
  • Stationary or modular.

300–800 t/h

  • Large jaw or gyratory primary.
  • Two-stage cone train.
  • Multiple screens and stockpiles.
  • PLC control, full dust suppression.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Feed materialConstruction waste
Mohs hardness3
Compressive strength~60 MPa
AbrasivenessLow
Recommended circuitmobile jaw + impact + screen
Assumed dutydemolition and recycling duties
Evaluation horizonfive-year view

These values are the starting point for a written proposal on construction waste crushing; they are nominal and should be confirmed against a sample test before manufacture.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutydemolition and recycling duties
Primary objectivemaximum mechanical availability
Evaluation horizonfive-year view
Site conditiona coastal export terminal
Operating teama rotating shift crew

Change any one of these assumptions and the recommended configuration for construction waste crushing may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  2. Include dust suppression, guarding, emergency stops and lock-out points in the layout drawing.
  3. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
  4. Sequence delivery so foundations cure while the equipment is still in manufacture.
  5. Confirm the haul-road and stockpile plan with a coastal export terminal in mind before fixing conveyor lengths.
  6. Book shipping, prepare the packing list and confirm the container loading plan.
  7. Apply mobile jaw + impact + screen; the reduction mechanism must suit low abrasion and a compressive strength near 60 MPa.
  8. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  9. Allocate screen area per deck; blinding and pegging are the most common hidden bottlenecks in a new plant.

Most delays at this stage come from missing feed data rather than from manufacturing capacity.

From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference
From enquiry to the first saleable tonne — HAMAC crushing and screening equipment reference.

What to verify before you sign

  • Local service partner, technician travel time and visa requirements for your market.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Product sampling points and the lab equipment needed for routine grading checks.
  • After-sales response time, technician availability and the warranty exclusions in writing.
  • Spare-parts consignment: one full liner or blow-bar set plus meshes, belts, bearings and seals.
  • Dust and noise control designed to the local emission limits for your market.
  • Written performance guarantee, sampling method and acceptance-test protocol.
  • Decommissioning or relocation value at the end of a five-year horizon.
  • Availability of a rotating shift crew for liner changes and the lifting equipment on site.

These are the items HAMAC puts in the technical proposal; if another offer is silent on them, ask why.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages55%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts14%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

Model a low, base and high case for tonnes per liner set. The spread tells you more than a single optimistic estimate.

Mistakes that cost more than the machine

  • Undersizing the screen, then blaming the crusher for a plant that never reaches your target tonnage.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Ordering no spares with the plant and waiting six weeks for the first liner set.
  • Leaving tramp-iron protection out of the scope to save a small percentage of capital.
  • Omitting a bypass chute, so a single screen fault stops the whole line.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Assuming the manufacturer's warranty covers wear parts and consumables.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.

For demolition and recycling duties, protect the maximum mechanical availability requirement explicitly in the contract documents.

Commissioning checklist

  1. Calibrate the belt scale and any level probes against a known load.
  2. Hand over the spare-parts list, manuals and maintenance schedule.
  3. Verify rotation direction on every motor before coupling.
  4. Measure and log the as-new CSS / setting for future wear comparison.
  5. Dry-run the plant empty for the specified period and record vibration.
  6. Confirm the direction and tension of every belt under no load.
  7. Check lubrication levels, grease lines and oil cooler operation.
  8. Test emergency stops, pull wires and interlock trips in sequence.

The commissioning record becomes the reference for every liner change in the five-year plan.

Construction waste Crushing Plant Configuration & Flow Sheet — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

How many products from a Construction waste plant?

Typically 3–4 saleable fractions from multi-deck screening in one pass.

Do you provide the layout?

Yes — a HAMAC proposal includes flow sheet, layout and foundation reference.

Can I inspect the machines before shipment?

Yes — workshop assembly, no-load testing and pre-shipment inspection can be arranged, in person or by video, before the balance payment.

What documents come with the shipment?

Packing list, commercial invoice, bill of lading, certificate of origin, manuals and the applicable conformity certificates.

Can the plant run on generator power?

Yes, with the starting method and total connected load reviewed — large crushers often need a soft starter or VFD on a generator supply.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

Do you build plants for demolition and recycling duties?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call