Overview
Published Spiral (Screw) Sand Washer specifications below are nominal values transcribed from HAMAC data. Actual performance depends on feed gradation, moisture, setting and screening efficiency.

Specification table
| Parameter | Value |
|---|---|
| XL515 | 515 7615 |
| XL765 | 765 7620 |
| XL920 | 920 7585 |
| 2XL920 | 920 7585 |
| XL1120 | 1120 9750 |
| 2XL1120 | 1120 9750 |
How to read the data
- Rated capacity is at a specified CSS / setting and material — treat it as saleable product, not crusher throughput.
- Feed size limit protects the chamber; oversize feed causes bridging.
- Motor power scales with rotor / chamber size, not linearly with capacity.
Selecting the right model
Match the model to your target t/h at the required product size, then confirm with a HAMAC engineer before order.
Reference data for this configuration
| Parameter | Reference value |
|---|---|
| Machine line | Spiral (Screw) Sand Washer |
| Category | Sand Making & Washing |
| Assumed duty | seasonal road-project supply |
| Evaluation horizon | seven-year view |
Ask for the same table from any competing supplier; without it, an offer for spiral (screw) sand washer cannot be compared on scope.
Published Spiral (Screw) Sand Washer model data
| Model | Screw diameter (mm) | Sink length (mm) | Feeding size (mm) | Capacity (t/h) | Power (kW) |
|---|---|---|---|---|---|
| XL515 | 515 | 7615 | ≤10 | 5–15 | 5.5 |
| XL765 | 765 | 7620 | ≤10 | 20–60 | 11 |
| XL920 | 920 | 7585 | ≤10 | 40–110 | 11 |
| 2XL920 | 920 | 7585 | ≤10 | 80–220 | 2×11 |
| XL1120 | 1120 | 9750 | ≤10 | 50–130 | 18.5 |
| 2XL1120 | 1120 | 9750 | ≤10 | 100–260 | 2×18.5 |
XL / 2XL screw sand washers, 5–260 t/h, remove clay and fines from manufactured sand with low water consumption. Read the table column by column against seasonal road-project supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a brownfield extension in the written HAMAC proposal.
Project profile these notes assume
| Assumption | Value |
|---|---|
| Operating duty | seasonal road-project supply |
| Primary objective | strict product cubicity |
| Evaluation horizon | seven-year view |
| Site condition | a brownfield extension |
| Operating team | a small contractor crew |
Change any one of these assumptions and the recommended configuration for spiral (screw) sand washer may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.
From enquiry to the first saleable tonne
- Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
- Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
- Confirm site voltage, frequency and applicable conformity standards before manufacture.
- Book shipping, prepare the packing list and confirm the container loading plan.
- Review the crusher chamber profile with the liner supplier against the feed material.
- Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
- Sequence delivery so foundations cure while the equipment is still in manufacture.
- Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
- Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.
A HAMAC project manager stays with the order from the first data sheet through hand-over in your market.

What to verify before you sign
- Nameplate data for local voltage, frequency and the applicable conformity scheme.
- Erection scope: supervision only, or full civil, mechanical and electrical installation.
- Access for liner change-out — crane radius, lifting points and clearance around the chamber.
- Liner alloy: high-chrome iron matched to the rock, not to the lowest purchase price.
- Guaranteed power draw and the strict product cubicity trade-off it implies.
- Availability of a small contractor crew for liner changes and the lifting equipment on site.
- Choke-feed arrangement: surge bin, feeder control and level indication.
- Control system language, telemetry and remote diagnostics availability.
- Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.
The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.
Where the money actually goes
| Cost line | Indicative share | What moves the number |
|---|---|---|
| Equipment & drive packages | 54% | Model size, number of stages and automation level |
| Ocean freight & insurance | 8% | Destination port, container count and out-of-gauge cargo |
| Civil works & foundations | 8% | Soil conditions, dynamic loads and site preparation |
| Erection, commissioning & training | 7% | Local labour, supervision scope and schedule |
| First-year wear parts | 15% | Rock abrasiveness, liner grade and operating hours |
| Power, lubricants & consumables | 8% | kWh per tonne, local tariff and dust suppression water |
A seven-year view normally reverses the ranking of two otherwise similar offers once wear and energy are included.
Mistakes that cost more than the machine
- Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
- Skipping the acceptance test, so no one has a baseline to measure degradation against.
- Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
- Choosing screen apertures before the concrete or asphalt mix design is fixed.
- Buying strict product cubicity on price alone and losing it in availability.
- Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
- Overlooking dust, noise and water permits in your market until erection has already started.
- Using one liner profile for both secondary and tertiary stages.
On a brownfield extension, the civil and logistics items deserve as much attention as the crusher itself.
Commissioning checklist
- Hand over the spare-parts list, manuals and maintenance schedule.
- Check hydraulic pressure, accumulator pre-charge and tramp-release function.
- Confirm the direction and tension of every belt under no load.
- Confirm all guards, emergency stops and pull-wire switches function.
- Verify chute liners, skirt rubber and impact bars after the first hour of feed.
- Introduce feed in graded steps: 25%, 50%, 75%, then full load.
- Verify rotation direction on every motor before coupling.
- Sample each product fraction and compare with the specification.
The commissioning record becomes the reference for every liner change in the seven-year plan.