● Crushing & grinding equipment · Since 2004
Equipment
Wheel Type Mobile CrushersTracked Crushing PlantsCone CrusherJaw CrusherImpact CrusherGrinding MillsModular Crushing PlantSupporting EquipmentsSand Making & Washing
Solutions
All solutionsEngineering solutions (700)Circuit designGrinding & mineralsProjectsMarkets
Company
About HAMACResourcesIndustry glossaryBlogFAQWear partsContact
Technical long-tail guide

Spiral (Screw) Sand Washer — Technical Specifications

Full HAMAC Spiral (Screw) Sand Washer technical data: capacity, feed size, motor power, weight and dimensions for every model. Download the datasheet with your quotation.

Overview

Published Spiral (Screw) Sand Washer specifications below are nominal values transcribed from HAMAC data. Actual performance depends on feed gradation, moisture, setting and screening efficiency.

Overview — HAMAC VSI sand making machine reference
Overview — HAMAC VSI sand making machine reference.

Specification table

Spiral (Screw) Sand Washer model data
ParameterValue
XL515515 7615
XL765765 7620
XL920920 7585
2XL920920 7585
XL11201120 9750
2XL11201120 9750

How to read the data

  • Rated capacity is at a specified CSS / setting and material — treat it as saleable product, not crusher throughput.
  • Feed size limit protects the chamber; oversize feed causes bridging.
  • Motor power scales with rotor / chamber size, not linearly with capacity.

Selecting the right model

Match the model to your target t/h at the required product size, then confirm with a HAMAC engineer before order.

Reference data for this configuration

Key parameters at a glance
ParameterReference value
Machine lineSpiral (Screw) Sand Washer
CategorySand Making & Washing
Assumed dutyseasonal road-project supply
Evaluation horizonseven-year view

Ask for the same table from any competing supplier; without it, an offer for spiral (screw) sand washer cannot be compared on scope.

Published Spiral (Screw) Sand Washer model data

Spiral (Screw) Sand Washer — nominal published data
ModelScrew diameter (mm)Sink length (mm)Feeding size (mm)Capacity (t/h)Power (kW)
XL5155157615≤105–155.5
XL7657657620≤1020–6011
XL9209207585≤1040–11011
2XL9209207585≤1080–2202×11
XL112011209750≤1050–13018.5
2XL112011209750≤10100–2602×18.5

XL / 2XL screw sand washers, 5–260 t/h, remove clay and fines from manufactured sand with low water consumption. Read the table column by column against seasonal road-project supply: the model you pick is the one whose published range brackets your target tonnage, not simply the largest machine in the series. Availability, motor rating and shipping data are re-confirmed for a brownfield extension in the written HAMAC proposal.

Project profile these notes assume

Assumed project profile
AssumptionValue
Operating dutyseasonal road-project supply
Primary objectivestrict product cubicity
Evaluation horizonseven-year view
Site conditiona brownfield extension
Operating teama small contractor crew

Change any one of these assumptions and the recommended configuration for spiral (screw) sand washer may change. HAMAC re-runs the same checks against your own numbers once the enquiry data sheet is received.

From enquiry to the first saleable tonne

  1. Run a sieve analysis on a representative sample and attach the grading curve to the enquiry.
  2. Record the as-built settings and give the operator a written daily, weekly and monthly schedule.
  3. Confirm site voltage, frequency and applicable conformity standards before manufacture.
  4. Book shipping, prepare the packing list and confirm the container loading plan.
  5. Review the crusher chamber profile with the liner supplier against the feed material.
  6. Plan training for a small contractor crew on CSS adjustment, liner change-out and lock-out / tag-out.
  7. Sequence delivery so foundations cure while the equipment is still in manufacture.
  8. Verify the electrical single-line diagram, cable sizing and starter type with the local utility.
  9. Commission with graded load, sample the product grading, then train operators on liner change-out and daily checks.

A HAMAC project manager stays with the order from the first data sheet through hand-over in your market.

From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference
From enquiry to the first saleable tonne — HAMAC VSI sand making machine reference.

What to verify before you sign

  • Nameplate data for local voltage, frequency and the applicable conformity scheme.
  • Erection scope: supervision only, or full civil, mechanical and electrical installation.
  • Access for liner change-out — crane radius, lifting points and clearance around the chamber.
  • Liner alloy: high-chrome iron matched to the rock, not to the lowest purchase price.
  • Guaranteed power draw and the strict product cubicity trade-off it implies.
  • Availability of a small contractor crew for liner changes and the lifting equipment on site.
  • Choke-feed arrangement: surge bin, feeder control and level indication.
  • Control system language, telemetry and remote diagnostics availability.
  • Delivery terms (FOB / CFR / CIF) with the destination port named explicitly.

The cheapest offer usually wins on equipment and loses on one of the last six items — freight terms, spares or the acceptance test.

Where the money actually goes

Indicative share of a five-year cost view
Cost lineIndicative shareWhat moves the number
Equipment & drive packages54%Model size, number of stages and automation level
Ocean freight & insurance8%Destination port, container count and out-of-gauge cargo
Civil works & foundations8%Soil conditions, dynamic loads and site preparation
Erection, commissioning & training7%Local labour, supervision scope and schedule
First-year wear parts15%Rock abrasiveness, liner grade and operating hours
Power, lubricants & consumables8%kWh per tonne, local tariff and dust suppression water

A seven-year view normally reverses the ranking of two otherwise similar offers once wear and energy are included.

Mistakes that cost more than the machine

  • Skipping a geotechnical check and discovering settlement under the primary crusher at a brownfield extension.
  • Skipping the acceptance test, so no one has a baseline to measure degradation against.
  • Planning the crusher but not the conveyors, transfer chutes and stockpile capacity around it.
  • Choosing screen apertures before the concrete or asphalt mix design is fixed.
  • Buying strict product cubicity on price alone and losing it in availability.
  • Ignoring clay and moisture until the first wet season, when decks blind and chambers pack.
  • Overlooking dust, noise and water permits in your market until erection has already started.
  • Using one liner profile for both secondary and tertiary stages.

On a brownfield extension, the civil and logistics items deserve as much attention as the crusher itself.

Commissioning checklist

  1. Hand over the spare-parts list, manuals and maintenance schedule.
  2. Check hydraulic pressure, accumulator pre-charge and tramp-release function.
  3. Confirm the direction and tension of every belt under no load.
  4. Confirm all guards, emergency stops and pull-wire switches function.
  5. Verify chute liners, skirt rubber and impact bars after the first hour of feed.
  6. Introduce feed in graded steps: 25%, 50%, 75%, then full load.
  7. Verify rotation direction on every motor before coupling.
  8. Sample each product fraction and compare with the specification.

The commissioning record becomes the reference for every liner change in the seven-year plan.

Spiral (Screw) Sand Washer Specifications & Technical Data — HAMAC crushing and grinding equipment
FAQ

Questions buyers ask

Short, direct answers from HAMAC engineers, plus configuration and cost notes.

Where can I get the Spiral (Screw) Sand Washer datasheet?

The full datasheet with dimensions, shipping data and spare-parts list is supplied with a HAMAC quotation.

Are the specifications guaranteed?

Values are nominal; a written proposal states the guaranteed performance for your material.

Do you build plants for seasonal road-project supply?

Yes — the duty profile changes the equipment list and wear package, and is recorded on the HAMAC project data sheet before the flow sheet is fixed.

What availability should I plan for?

A well-run plant targets 85–90% or better of scheduled time; the figure depends on spares stock, feed consistency and planned liner changes.

How long does delivery take?

Manufacturing time depends on the equipment list and level of customisation; the written proposal states the delivery schedule from the deposit date.

What information do I need for a quotation?

Material, maximum feed size, required t/h, target product sizes, site voltage, mobility requirement and destination port.

Is installation supervision included?

It can be included in the scope. HAMAC provides erection supervision, commissioning and operator training as standard export services.

Request a quotation

Tell us what you need

A short message is enough. A HAMAC engineer replies with a flow sheet and budget within 24 hours.

Get a free plant design & quotation

Two fields are enough. An engineer replies with a flow sheet and budget within 24 hours.

Not sure what to write? Tap what fits. optional · one tap each
Material
Target capacity
We only use your details to answer this enquiry. Privacy Policy
✆

WhatsApp / Mobile

+86-151-3623-6223
☎
⌖

Factory & headquarters

No. 57 Kexue Avenue, National Hi-Tech Industrial Development Zone, Zhengzhou, Henan, China

⏱

Response time

Technical reply within 24 hours, Monday to Saturday.

Tell us your material, capacity and site conditions.

Our engineers will return a process flow, equipment list and budget quotation within 24 hours — at no cost and with no obligation.

WhatsApp Get a quote Call